A-4                          INSTALLATION                                      A-4 

     

MACHINE GROUNDING 
 

This welder must be grounded! See your local and 
national electrical codes for proper grounding 
methods.  
  The high frequency generator, being similar to a 
radio transmitter, may cause radio, TV and 
electronic equipment interference problems. These 
problems may be the result of radiated interference. 
Proper grounding methods can reduce or eliminate 
radiated interference.   
Radiated interference can develop in the following 
four ways:   
1    Direct interference radiated from the welder.   
2    Direct interference radiated from the welding 
leads.  
3 Direct interference radiated from feedback into the 
power lines.   
4 Interference from re-radiation of "pickup" by 
ungrounded metallic objects.   
Keeping these contributing factors in mind, installing 
equipment per the following instructions should 
minimize problems.   
1 Keep the welder power supply lines as short as 
possible and enclose as much of them as possible 
in rigid metallic conduit or equivalent shielding for a 
distance of 50 feet (15.2m). There should be good 
electrical contact between this conduit and the 
welder case ground. Both ends of the conduit 
should be connected to a driven ground and the 
entire length should be continuous.   
2 Keep the work and electrode leads as short as 
possible and as close together as possible. Lengths 
should not exceed 25 ft (7.6m). Tape the leads 
together when practical.   
3 Be sure the torch and work cable rubber 
coverings are free of cuts and cracks that allow high 
frequency leakage.   
4 Keep the torch in good repair and all connections 
tight to reduce high frequency leakage.   
5 The work piece must be connected to an earth 
ground close to the work clamp, using one of the 
following methods:   

a) A metal underground water pipe in direct contact 
with the earth for ten feet or more.   
b) A 3/4" (19mm) galvanized pipe or a 5/8" 
(16mm)solid galvanized iron, steel or copper rod 
driven at least eight feet into the ground.   
The ground should be securely made and the 
grounding cable should be as short as possible 
using cable of the same size as the work cable, or 
larger. Grounding to the building frame electrical 
conduit or along pipe system can result in 
reradiation, effectively making these members 
radiating antennas.   
6    Keep cover and all screws securely in place.   
7 Electrical conductors within 50 ft (15.2m) of the 
welder should be enclosed in grounded rigid 
metallic conduit or equivalent shielding, wherever 
possible. Flexible metallic conduit is generally not 
suitable.  
8 When the welder is enclosed in a metal building, 
the metal building should be connected to several 
good earth driven electrical grounds (as in 5 (b) 
above) around the periphery of the building.   
Failure to observe these recommended installation 
procedures can cause radio or TV and electronic 
equipment interference problems and result in 
unsatisfactory welding performance resulting from 
lost high frequency power.   

INPUT CONNECTIONS   

Be sure the voltage, phase, and frequency of the 
input power is as specified on the rating plate, 
located on the rear of the machine.   
Have a qualified electrician provide input power 
supply to the receptacle or cord in accordance with 
all local and national electrical codes. Use a single 
phase line or one phase of a two or three phase 
line. 

 

Choose an input and grounding wire size according 
to local or national codes. Refer to 

 the Technical 

Specifications 

page at the beginning of this section. 

Fuse the input circuit with the recommended super 
lag fuses or delay type circuit breakers. 
 

Содержание SUPERARC315

Страница 1: ...to amperaje Hot start para mejorar el encendido del arco evitando que el electrodo se pegue Perilla control de fuerza del arco para mejor desempe o esto le permite adaptar el arco para llevar a cabo t...

Страница 2: ...CHINE Suitable for 1x220V Operators s Manual Safety Setup and General Use Guide REV 2 0 00133 16 Issue Date May 19 2016 Manual No 0 1523 EMPRESAS CARBONE S A Calle 5ta Rio Abajo Panam Panam Telefonos...

Страница 3: ...erformance Should you have an issue or question concerning your unit please contact performance technical support available through the main company headquarters available in your country For best ser...

Страница 4: ...______ Where Purchased _____________________________ Whenever you request replacement parts or information on this equipment please always supply information you have recorded above This product is co...

Страница 5: ...e information please contact our Support The warranty does not cover improper use maintenance or consumables Do not attempt to alter or defeat any piece or part of your unit particularly any safety de...

Страница 6: ...tection is available exclude them from the work area Even brief expo sure to the rays from the welding arc can damage unprotected eyes Always wear hearing protection because welding and cutting can be...

Страница 7: ...s nose or throat are signs that you need to increase ventilation Stop immediately and relocate work if necessary until adequate ventilation is ob tained Stop work completely and seek medical help if i...

Страница 8: ...materials including rags and spare clothing away from area Keep all flammable fuels and liquids stored separately from work area Visually inspect work area when job is completed for the slightest trac...

Страница 9: ...tput Connection for Stick Welding A 6 Quick Disconnect Plug A 6 Operation Section B Safety precautions B 1 Product Description B 2 Welding Capability B 2 Limitations B 2 Control Panel B 3 Controls and...

Страница 10: ...a 10 minute cycle Example 315A 60 for DC Stick MODEL SUPER ARC315 Voltage 1xAC 220 230 240V 10 50 60Hz INPUT Fuse rating 80A No load Voltage 80V current Adjusting Range 315A Rated Output Current 20 3...

Страница 11: ...sed on the IEC60974 1 National Electric Code Use a Super Lag type fuse or circuit breaker with a delay in tripping action may be used with a maximum 100 amp protected receptacle if dedicated for the w...

Страница 12: ...blems STACKING The machine cannot be stacked TRANSPORT UNLOADING Never underestimate the weight of the equipment Never make the cargo pass or leave it suspended over people or things Neither let the e...

Страница 13: ...ose to the work clamp using one of the following methods a A metal underground water pipe in direct contact with the earth for ten feet or more b A 3 4 19mm galvanized pipe or a 5 8 16mm solid galvani...

Страница 14: ...CT PROCEDURE The Inverter machine auto reconnects to either 115V or 230V supply Fuse the input circuit with time delay fuses or delay type1 circuit breakers Using fuses or circuit breakers smaller tha...

Страница 15: ...on engine drives not conforming to these conditions Such drives may deliver unacceptably high voltage levels to the Inverter machine power source CONNECTIONS FOR STICK SMAW WELDING A NEGATIVE CONNECTI...

Страница 16: ...der electrically hazardous conditions such as welding in wet areas or on or in the workpiece FUMES AND GASES can be dangerous Keep your head out of fumes Use ventilation or exhaust at the arc or both...

Страница 17: ...n and maintenance sectors PROCESS LIMITATIONS The machines are not recommended for arc gouging due to it s limited output capacity and are also not recommended for pipe thawing RECOMMENDED QUIPMENT IN...

Страница 18: ...B 1 CONTROL PANEL 1 FRONT PANEL 2 BACK PANEL CONTROL FUNCTIONALITY 1 indication of welding current Voltage 2 power switch 3 welding amps regulator 4 ARC force regulator 5 indicating light of power 6...

Страница 19: ...lding 1input phases IP21S Casing protection degree in compliance with the EN 60529 Standard IP2XX Casing protected against access to dangerous components with fingers and against the introduction of f...

Страница 20: ...MAW Process Welding Amp Range for Stick Electrode Size ELECTRODE TYPE POLARITY 3 32 1 8 5 32 E6010 DC 40 70 75 130 90 175 E6011 DC 40 80 55 110 105 135 E6013 DC 70 95 100 135 145 180 E7014 DC 75 95 10...

Страница 21: ...The arc force control setting will vary from person to person as well with different rod angles positions and arc lengths all factoring into the arc force control performance Set the arc start intensi...

Страница 22: ...least 5 minutes to allow time for the process to take place ROUTINE AND PERIODIC MAINTENANCE 1 Disconnect power supply lines to machine before performing periodic maintenance 2 Periodically clean the...

Страница 23: ...This column describes possible symptoms that the machine may exhibit Find the listing that best describes the symptom that the machine is exhibiting Step 2 POSSIBLE CAUSE The second column labeled PO...

Страница 24: ...amp lights 2 Oer current Green lamp lights 1 Welding after cooling 2 Input voltage too low or the machine fails No output of welder 1 Over crrent protection 2 Welder fails 1 Over load using 2 Maintena...

Страница 25: ...1 NOTE This diagram is for reference only It may not be accurate for all machines covered by this manual If the diagram is illegible write to the Service Department for a replacement Give the equipme...

Страница 26: ...y 1 TIG Torch 1 optional accessory Ground clamp cable 1 Welding holder cable 1 No Certificate of quality Name of product DC MMA TIG WELDING MACHINE Type of product PowerArc250ST Packing No Test result...

Страница 27: ...electrically live parts or electrode with skin or wet clothing Insulate yourself from work and ground No toque las partes o los electrodos bajo carga con la piel o ropa moja da Aislese del trabajo y...

Страница 28: ...e Be und Entl ftung des Arbeitsplatzes Mantenha seu rosto da fuma a Use ventila o e exhaust o para remover fumo da zona respirat ria Turn power off before servicing Desconectar el cable de ali mentaci...

Отзывы: