background image

 

 

[email protected] 

docs.carbide3d.com

 

 

08/19/2021 

v1.0

 

 

16 

5.

 

Use your finger or a small flathead screwdriver to carefully remove the fuse. See 

Figure 12

6.

 

Insert a new 15A 250V 5×20mm fuse. 

7.

 

Replace the metal EMI shield. 

8.

 

Replace the back panel of the BitRunner V2. 

Figure 12 

Содержание BitRunner V2

Страница 1: ...ready for BitRunner V2 right out of the box Users with Shapeoko 3 models with Carbide Motion boards 2 3 and earlier machines purchased before Black Friday 2019 will need to have purchased a new Carbid...

Страница 2: ...Note A BitRunner V2 Deluxe or Standard 1 BitRunner V2 enclosure and attached power cords B Control Pendant 1 Enable disable the BitRunner V2 C Logic Cable 1 Connects the BitRunner V2 to the controller...

Страница 3: ...f the machine 5 Reconnect the motor homing switch power and USB cables 1 3 Connect the BitRunner V2 to the Controller The BitRunner V2 is designed to lay flat on the ground near your work table and el...

Страница 4: ...o the BitRunner V2 1 Plug the male end of the logic cable into the 6 pin female port on the top of the BitRunner V2 See Figure 2 a The black plastic latch on the side of the connector faces RIGHT b Ma...

Страница 5: ...rail b The connector fits tightly Press in and down to get it to seat fully Figure 3 WARNING There is a small triangular shaped peg on one side of the female connector which must face OUT The peg is q...

Страница 6: ...e to connect the BitRunner V2 to the control pendant The two ends of the cable are interchangeable See Figure 4 1 Plug one end of the Ethernet cable into the Ethernet jack on the control pendant a The...

Страница 7: ...The clear latch and black strain relief boot face LEFT b Press firmly to fully seat the connector You will hear the latch click into place 1 5 Connect the BitRunner V2 to the Router and Power 1 Plug t...

Страница 8: ...Insert the banana plug into the round port on the top of the BitRunner V2 See Figure 6 NOTE We recommend using the included grounding cable to ground the spindle router in case of static discharge or...

Страница 9: ...Make sure the cable is secured where it will not get in the way of the machine s movements 1 7 Upgrade Carbide Motion The BitRunner V2 requires at least Carbide Motion 4 1 Check for the build number...

Страница 10: ...unner V2 is enabled and disabled via the control pendant To enable the BitRunner V2 1 Press the control pendant button to supply power to the router The red button LED will turn ON See Figure 8 To dis...

Страница 11: ...ode also triggers alert boxes to open in Carbide Motion which let you know when it s time to change the end mill what RPM to set the spindle to etc When G code is executed in Carbide Motion specific c...

Страница 12: ...tion 4 Change the end mill 5 Flip the power switch on the router to the ON position 6 Press the control pendant button again to re enable the BitRunner V2 button LED will turn on 7 In Carbide Motion c...

Страница 13: ...nner V2 is plugged into a power outlet Cables are not correctly plugged in Ensure all cables are correctly connected In particular check correct connection of the logic cable at the Shapeoko controlle...

Страница 14: ...use may have blown if you know the G code is good and the control pendant LED still lights up but the BitRunner V2 has stopped working 1 Unplug the BitRunner V2 from the power source and unplug all ca...

Страница 15: ...ewdriver to carefully pry open the lid of the small black fuse box See Figure 11 a Pry from the left side of the fuse box near the B embossed on the lid Figure 11 NOTE Figure 11 shows the deluxe BitRu...

Страница 16: ...com 08 19 2021 v1 0 16 5 Use your finger or a small flathead screwdriver to carefully remove the fuse See Figure 12 6 Insert a new 15A 250V 5 20mm fuse 7 Replace the metal EMI shield 8 Replace the bac...

Отзывы: