Cape Dory 270
Technical Information
LOA
27' 3"
LWL 20'
9"
Beam 9'
5"
Draft
3' 0” Board Up
7’ 0” Board Down
Displacement 8380
Ballast 3250
SA
398 100% Fore Triangle
I 38'
0"
P 32'
4"
J 11'
7"
E 11”
0”
Main Luff Slug Size
B8 1" Flat
Main Foot Slug Size
B6 3/4” Flat
Main Tack Cut Back
2”
Standing & Running Rigging
Forestay (W)
1/4 - 38' 10"
Backstay (W)
1/4 - 40' 3"
Uppers (W)
7/32 – 37’ 1”
Forward Lowers (W)
3/16 - 19' 0"
Aft Lowers (W)
3/16 – 19’ 2”
Main Halyard (P)
7/16 – 75’
Jib Halyard (P)
7/16 – 80’
Main Sheet (D)
7/16 – 37’
Jib Sheet (D)
7/16 – 33’
Genoa Sheet (D)
7/16 – 40’
Topping Lift (D)
1/4 – 19’
Clew Reef #1 (D)
3/8 – 22’
Clew Reef #2 (D)
3/8 – 28’
Spinnaker Halyard (D)
7/16 – 90’
Spinnaker Sheet (D)
7/16 – 40’
CB Tackle (D)
3/8 – 13’
CB Pennant (D)
1/4 - 7’
W - Wire
P - Prestretched Dacron Rope
D - Dacron Braided Rope
www.capedory.org
- 70 -
Содержание 270
Страница 1: ...CAPE DORY 270 Edited by Catherine Monaghan 2007 ...
Страница 48: ...www capedory org 48 ...
Страница 51: ...www capedory org 51 ...
Страница 71: ...www capedory org 71 ...
Страница 72: ...www capedory org 72 ...
Страница 73: ...www capedory org 73 ...
Страница 74: ...www capedory org 74 ...
Страница 75: ...www capedory org 75 ...
Страница 76: ...www capedory org 76 ...
Страница 77: ...www capedory org 77 ...
Страница 78: ...www capedory org 78 ...
Страница 79: ...www capedory org 79 ...
Страница 80: ...www capedory org 80 ...
Страница 81: ...www capedory org 81 ...
Страница 82: ...www capedory org 82 ...
Страница 83: ...www capedory org 83 ...
Страница 84: ...www capedory org 84 ...
Страница 85: ...www capedory org 85 ...
Страница 86: ...www capedory org 86 ...
Страница 87: ...www capedory org 87 ...
Страница 88: ...www capedory org 88 ...
Страница 89: ...www capedory org 89 ...
Страница 90: ...www capedory org 90 ...
Страница 91: ...www capedory org 91 ...
Страница 92: ...www capedory org 92 ...
Страница 93: ...www capedory org 93 ...
Страница 94: ...www capedory org 94 ...