
OM-1587 Page 22
7-2.
Optional Dual Schedule Switch Diagrams
1
Momen 2P
(Momentary-Contact 2-Pole
Switch)
2
Maint 2P (Maintained-Contact
2-Pole Switch)
3
Maint 1P (Maintained-Contact
1-Pole Switch)
4
Trigger
Allows dual scheduling after
establishing a welding arc.
5
Momen 1P
(Momentary-Contact 1-Pole
Switch)
.
If trigger is used for dual sched-
ule switch, Trigger Hold is dis-
abled.
.
Switch type is selected in system setup
(see Section 9).
1
1
2
2
3
3
4
1
2
3
4
B
A
TR
3
Adapter
1
1
2
2
3
A
4
B
1
1
1
2
2
3
A
4
B
2
1
2
TR
4
Trigger
DSS-8
DSS-10
DSS-9M
1
3
5
Содержание C-D64M
Страница 2: ......
Страница 20: ...OM 1587 Page 16 Notes ...
Страница 44: ...OM 1587 Page 40 SECTION 15 ELECTRICAL DIAGRAM Figure 15 1 Circuit Diagram ...
Страница 45: ...OM 1587 Page 41 SD 184 796 B ...