6-10KVA Rack-mount UPS User Manual Installation
17
UPS2 input breaker
UPS1 input breaker
UPS2 output breaker
UPS1 output breaker
Fig.11 Wiring Diagram of 6KVA and 10KVA in parallel
3. Operation
1) To perform the general operation, follow the stand-alone operating requirement.
2) Startup: The units transfer to INV mode simultaneously as they start up sequentially
in Line mode.
3) Shutdown: the units shut down sequentially in INV mode. When the last one