Canon model VB-S800D A&E Specifications 

OWNER / November 22, 2013 

28 23 00 - 2 

Video Surveillance System 

3.

 

The OWNER Project Manager shall be the interpreter of the requirements of the Drawings 
and Specifications, subject to the final approval of OWNER.  All interpretations and 
opinions of the Security Consultant shall be made in writing or in the form of drawings. 

E.

 

Intent And Correlation 

1.

 

The intent of the Project Drawings and Specifications is to include all items necessary for 
the proper execution and completion of the Work. 

2.

 

The Project Drawings and Specifications are complementary, and what is required by any 
one shall be as binding as if required by both. 

1.02

 

REFERENCES 

A.

 

NFPA 70 – Current version. 

B.

 

NFPA 731 – Security System Installation. 

C.

 

IEEE Standards on Networks. 

D.

 

All power supplies shall be UL listed and have a UL label on them. 

1.03

 

DEFINITIONS 

A.

 

Words that are in common use are used throughout the Drawings and Specifications, except: 

Words which have well-known technical or trade meanings are used in accordance with such 
recognized meanings. 

B.

 

Whenever the following listed words and phrases are used, they shall be mutually understood to 
have the following respective meanings: 

1.

 

The words “as indicated.” means:  as shown on the Drawings, and in accordance with the 
Specifications. 

2.

 

The words “as required.” means:  as required to provide a complete and satisfactory Work 
in full conformance with the Drawings and Specifications. 

3.

 

The word “New” means:  new Work to be provided by Contractor. 

4.

 

The word “Provide” means:  furnish, install, connect, test and make ready for use. 

5.

 

The words “Relocate Existing” means:  remove existing item from present location.  
Reinstall, re-connect, and test existing item and make ready for use at new location as 
shown on the Drawings. 

6.

 

The words “Remove Existing” means:  remove existing item and return item to OWNER. 

7.

 

The word “Replace” means:  remove existing item and return item to OWNER.  Provide 
new item as indicated. 

8.

 

The word “Work”:  The Work is the completed construction required by the Drawings and 
Specifications, and includes all labor necessary to produce such construction, and all 
materials and equipment incorporated or to be incorporated in such construction. 

9.

 

The word “Furnish” means:  supply item as specified.  Item to be installed by others. 

1.04

 

SYSTEM DESCRIPTION 

A.

 

General Description 

The video surveillance system shall consist of only four types of cameras—existing analog fixed 
positioned domed cameras, existing analog domed PTZ cameras, new IP fixed position domed 
cameras with varifocal lenses with views as shown on the drawings, and new IP PTZ domed 

Содержание VB-S800D A&E

Страница 1: ... through 2 02 P herein Canon reserves the right to change the features or specifications of the aforementioned model at any time without notice The architect or engineer preparing the actual video surveillance specifications should therefore refer to and confirm specifications for such model as of the date of use Canon makes nor representation or warranty about fitness of purpose of the above refe...

Страница 2: ... 1 The words as indicated means as shown on the Drawings and in accordance with the Specifications 2 The words as required means as required to provide a complete and satisfactory Work in full conformance with the Drawings and Specifications 3 The word New means new Work to be provided by Contractor 4 The word Provide means furnish install connect test and make ready for use 5 The words Relocate E...

Страница 3: ...ings represent the level of system design to be provided by OWNER Contractor shall provide all additional system design work required including 1 Conduit layout and sizing 2 Wire and cable layout and sizing 3 Point to point wiring and equipment hook up information 4 Equipment mounting details 5 Design of equipment cabinets 6 Other detailed design work required B Contractor s design shall conform t...

Страница 4: ...xternal equipment e Connections to power networks and other communications circuits 7 Project Record Drawings shall show the physical placement of each device and conduit or aerial centerline to be accurate to within one foot 1 of the nearest landmark Where the site plan furnished by Puyallup School District conflicts with actual conditions Contractor shall amend site plan as required Indicate exa...

Страница 5: ...er of the system proposed for at least two 2 years d Contractor shall submit the names and phone numbers of customers for at least three 3 other projects of similar size and complexity using similar technologies 2 Supervision of Work a Contractor shall employ a competent Foreman to be in responsible charge of the Work Foreman shall be on the project site daily during the execution of the Work b Co...

Страница 6: ...s and techniques 2 The Contractor shall employ a competent foreman who shall be in attendance at the project site during the progress of the Work The foreman shall represent the Contractor and all communications given to the foreman shall be as binding as if given to the Contractor C Regulatory Requirements 1 All Work is to conform to all building fire and electrical codes and ordinances applicabl...

Страница 7: ...hat Contractor fails to clean up OWNER may elect to have clean up performed by others with the costs of such clean up being charged to the Contractor 3 Construction Aids a Definition Construction Aids are facilities and equipment required by personnel to facilitate the execution of the Work Construction Aids include scaffolds staging ladders platforms hoists cranes lifts trenchers core drillers pr...

Страница 8: ...quipment to the greatest extent possible 7 Install all equipment 8 Test and inspect all systems 9 Perform all other Work as required 10 Provide as built drawings 11 Perform the Acceptance Test 12 Provide training 1 10 SCHEDULING The Contractor within five 5 days after being awarded the contract shall prepare and submit for OWNER s information an estimated progress schedule for the Work The progres...

Страница 9: ... and prior to requesting the Acceptance Testing Inspection Contractor shall conduct a final inspection and pre test all equipment and system features Contractor shall correct any deficiencies discovered as the result of the inspection and pre test B Contractor shall submit a request for the Acceptance Test Inspection in writing to the OWNER Project Manager no less than fourteen days prior to the r...

Страница 10: ...s Wire and cable shall be sized to provide minimum voltage drop and minimum resistance to the devices being supplied 4 All cables shall be specifically designed for their intended use direct burial aerial etc 5 Comply with equipment manufacturers recommendations for wire and cable 6 Color codes shall be consistent in cables used for the same purpose 7 Comply with all applicable codes and ordinance...

Страница 11: ... 3 type CMOS primary color filter B Number of Effective Pixels Approximately 2 1 million pixels C Scanning Method Progressive D Lens Fixed Focal Length lens 4x digital zoom E Focal Length 2 7mm F F number F1 6 G Viewing Angle Horizontal 95 Vertical 60 H Day Night Switch Auto Manual I Min Subject Illumination 1 Day Mode color 0 45 lux F1 6 shutter speed 1 30 sec when smart shade control is off 50IR...

Страница 12: ...240 C Video Quality JPEG H 264 5 levels D Frame Rate JPEG 0 1 30 fps H 264 1 2 3 5 6 10 15 30 fps E Max Frame Rate 1920 x 1080 30 fps F I Frame Interval 0 5 1 1 5 2 3 4 5 sec G Simultaneous Client Access Max 30 Clients 1 Admin Client H 264 Max 10 Clients H Camera Control Administrator Authorized user Guest user Max 50 user names and passwords registered for authorized users I Access Control User a...

Страница 13: ...storage memory in camera Max approx 5 MB Frame Rate Max 10 fps JPEG 30fps H 264 W Event Notification HTTP SMTP e mail X Digital PTZ Cropping Sizes 640x360 512x288 384x216 256x144 128x72 640x480 512x384 384x288 256x192 128x96 Y On Screen Display Available Z Daylight Saving Time Available AA Custom Settings Number of Registers 4 Items to Register Exposure Smart Shade Control White Balance Image Qual...

Страница 14: ...05 CAMERA INTERFACE A Network Terminal LAN x 1 RJ45 100Base TX auto full duplex half duplex B Audio Input Terminal common for LINE IN MIC IN 1 Φ3 5mm Φ0 14 in mini jack connector monaural 2 Switch LINE IN MIC IN in the setting page 3 LINE IN x 1 connect to an amplifier microphone or MIC IN x 1 connect to a microphone w o amplifier C External Device I O Terminal Input x 1 Output x 1 D Memory Card M...

Страница 15: ... the network equipment 6 The Contractor shall coordinate with the OWNER s ITC Department for interface with the network 7 All communications cables shall be kept away from power circuits 8 The Contractor shall also execute adequate testing of the system to insure proper operation 9 The Contractor shall provide adequate training of the system users to insure adequate understanding to prevent operat...

Страница 16: ...oducing components such as resistors regulators and the like F Conduit And Raceway Installation 1 Design lay out size and plan new conduit and raceway systems as required 2 Indoor Requirements a Route exposed conduit and raceway parallel and perpendicular to walls and adjacent piping b Maintain minimum a six 6 inch clearance between conduit and piping c Group conduit in parallel runs where practic...

Страница 17: ...ltage plug in transformers to outlet with screw or strap Clearly label all transformers to identify purpose and use K Cutting And Patching The Contractor shall be responsible for all cutting fitting or patching that may be required to complete the Work L Painting All conduit fittings and junction boxes shall be painted to match the existing surfaces they are mounted on This work may be performed a...

Отзывы: