Canon VB-S800D A&E Скачать руководство пользователя страница 1

Canon model VB-S800D A&E Specifications 

OWNER / November 22, 2013 

28 23 00 - 1 

Video Surveillance System 

SECTION 28 23 00 

VIDEO SURVEILLANCE SYSTEM 

DISCLAIMER FOR VIDEO SURVEILLANCE SPECIFICATIONS 

The following is a recommended form of disclaimer with respect to the illustrative specifications for 

the Video System Surveillance System using the Canon NVS camera systems.  The disclaimer 

presumes that the technical details in each of the illustrations, as set forth under Section 2.02 System 

Specifications, have been reviewed and confirmed by Canon as meeting the technical specifications 

for each of the relative product models as of the date hereof.   Further, it is recommended that the 

examples to be delivered include an embedded “watermark” or other reference on each page 

indicating that they are “For Illustration Only”. 
DISCLAIMER:  These “Section 28 23 00 Video Surveillance System” specifications (the “Form 

Specifications”) are general in nature and solely for illustration.  The Form Specifications are not 

intended for any specific application or use and project specific considerations must be taken into 

account in the architect’s or engineer’s preparation of actual system specifications.   Canon makes no 

representation or warranty with respect to these Form Specifications and nothing contained herein 

shall create, or be inferred to create, any express or implied warranty by Canon.  These Form 

Specifications are intended solely to for the purpose of reflecting general guidelines for video 

surveillance system specifications, taking into account the features of the Canon model VB-S800D in 

production as of the date hereof, as set forth under Sections 2.02 B through 2.02 P herein.  Canon 

reserves the right to change the features or specifications of the aforementioned model at any time, 

without notice.  The architect or engineer preparing the actual video surveillance specifications 

should therefore refer to and confirm specifications for such model as of the date of use.  Canon makes 

nor representation or warranty about fitness of purpose of the above referenced model for any 

intended application, which determination shall be the sole responsibility of others.   Canon assumes 

no liability with respect to, arising from, or arising out of the Form Specifications or any use thereof.  

 

PART 1 

GENERAL 

1.01

 

SUMMARY 

A.

 

Section Includes 

1.

 

Camera Assembly (camera, lens, housing, mount, etc.) 

B.

 

Contractor’s Responsibility 

The Contractor shall provide and pay for all labor, materials, equipment, tools, utilities, 
construction equipment and machinery, transportation and other facilities and services necessary 
for the proper execution, operation and completion of the Work. 

C.

 

Specification Language 

Specifications and notes are written in imperative and abbreviated form. Imperative language of 
the technical specifications is directed at the Contractor, unless specifically noted otherwise. 
Incomplete sentences shall be completed by inserting “shall”, “shall be”, “the Contractor shall”, 
and similar mandatory phrases by inference. The words “shall be” shall be supplied by inference 
where a colon (:) is used within product specifications. 

D.

 

Drawings And Specifications 

1.

 

Contractor shall be provided three (3) sets of the Drawings and Specifications for his use. 
Additional sets, if requested by Contractor, shall be furnished to the Contractor for the 
actual cost of reproduction. 

2.

 

Contractor shall carefully study the Drawings and Specifications, and shall at once report 
any error, unforeseen circumstances, inconsistency or omission he may discover. 

Содержание VB-S800D A&E

Страница 1: ... through 2 02 P herein Canon reserves the right to change the features or specifications of the aforementioned model at any time without notice The architect or engineer preparing the actual video surveillance specifications should therefore refer to and confirm specifications for such model as of the date of use Canon makes nor representation or warranty about fitness of purpose of the above refe...

Страница 2: ... 1 The words as indicated means as shown on the Drawings and in accordance with the Specifications 2 The words as required means as required to provide a complete and satisfactory Work in full conformance with the Drawings and Specifications 3 The word New means new Work to be provided by Contractor 4 The word Provide means furnish install connect test and make ready for use 5 The words Relocate E...

Страница 3: ...ings represent the level of system design to be provided by OWNER Contractor shall provide all additional system design work required including 1 Conduit layout and sizing 2 Wire and cable layout and sizing 3 Point to point wiring and equipment hook up information 4 Equipment mounting details 5 Design of equipment cabinets 6 Other detailed design work required B Contractor s design shall conform t...

Страница 4: ...xternal equipment e Connections to power networks and other communications circuits 7 Project Record Drawings shall show the physical placement of each device and conduit or aerial centerline to be accurate to within one foot 1 of the nearest landmark Where the site plan furnished by Puyallup School District conflicts with actual conditions Contractor shall amend site plan as required Indicate exa...

Страница 5: ...er of the system proposed for at least two 2 years d Contractor shall submit the names and phone numbers of customers for at least three 3 other projects of similar size and complexity using similar technologies 2 Supervision of Work a Contractor shall employ a competent Foreman to be in responsible charge of the Work Foreman shall be on the project site daily during the execution of the Work b Co...

Страница 6: ...s and techniques 2 The Contractor shall employ a competent foreman who shall be in attendance at the project site during the progress of the Work The foreman shall represent the Contractor and all communications given to the foreman shall be as binding as if given to the Contractor C Regulatory Requirements 1 All Work is to conform to all building fire and electrical codes and ordinances applicabl...

Страница 7: ...hat Contractor fails to clean up OWNER may elect to have clean up performed by others with the costs of such clean up being charged to the Contractor 3 Construction Aids a Definition Construction Aids are facilities and equipment required by personnel to facilitate the execution of the Work Construction Aids include scaffolds staging ladders platforms hoists cranes lifts trenchers core drillers pr...

Страница 8: ...quipment to the greatest extent possible 7 Install all equipment 8 Test and inspect all systems 9 Perform all other Work as required 10 Provide as built drawings 11 Perform the Acceptance Test 12 Provide training 1 10 SCHEDULING The Contractor within five 5 days after being awarded the contract shall prepare and submit for OWNER s information an estimated progress schedule for the Work The progres...

Страница 9: ... and prior to requesting the Acceptance Testing Inspection Contractor shall conduct a final inspection and pre test all equipment and system features Contractor shall correct any deficiencies discovered as the result of the inspection and pre test B Contractor shall submit a request for the Acceptance Test Inspection in writing to the OWNER Project Manager no less than fourteen days prior to the r...

Страница 10: ...s Wire and cable shall be sized to provide minimum voltage drop and minimum resistance to the devices being supplied 4 All cables shall be specifically designed for their intended use direct burial aerial etc 5 Comply with equipment manufacturers recommendations for wire and cable 6 Color codes shall be consistent in cables used for the same purpose 7 Comply with all applicable codes and ordinance...

Страница 11: ... 3 type CMOS primary color filter B Number of Effective Pixels Approximately 2 1 million pixels C Scanning Method Progressive D Lens Fixed Focal Length lens 4x digital zoom E Focal Length 2 7mm F F number F1 6 G Viewing Angle Horizontal 95 Vertical 60 H Day Night Switch Auto Manual I Min Subject Illumination 1 Day Mode color 0 45 lux F1 6 shutter speed 1 30 sec when smart shade control is off 50IR...

Страница 12: ...240 C Video Quality JPEG H 264 5 levels D Frame Rate JPEG 0 1 30 fps H 264 1 2 3 5 6 10 15 30 fps E Max Frame Rate 1920 x 1080 30 fps F I Frame Interval 0 5 1 1 5 2 3 4 5 sec G Simultaneous Client Access Max 30 Clients 1 Admin Client H 264 Max 10 Clients H Camera Control Administrator Authorized user Guest user Max 50 user names and passwords registered for authorized users I Access Control User a...

Страница 13: ...storage memory in camera Max approx 5 MB Frame Rate Max 10 fps JPEG 30fps H 264 W Event Notification HTTP SMTP e mail X Digital PTZ Cropping Sizes 640x360 512x288 384x216 256x144 128x72 640x480 512x384 384x288 256x192 128x96 Y On Screen Display Available Z Daylight Saving Time Available AA Custom Settings Number of Registers 4 Items to Register Exposure Smart Shade Control White Balance Image Qual...

Страница 14: ...05 CAMERA INTERFACE A Network Terminal LAN x 1 RJ45 100Base TX auto full duplex half duplex B Audio Input Terminal common for LINE IN MIC IN 1 Φ3 5mm Φ0 14 in mini jack connector monaural 2 Switch LINE IN MIC IN in the setting page 3 LINE IN x 1 connect to an amplifier microphone or MIC IN x 1 connect to a microphone w o amplifier C External Device I O Terminal Input x 1 Output x 1 D Memory Card M...

Страница 15: ... the network equipment 6 The Contractor shall coordinate with the OWNER s ITC Department for interface with the network 7 All communications cables shall be kept away from power circuits 8 The Contractor shall also execute adequate testing of the system to insure proper operation 9 The Contractor shall provide adequate training of the system users to insure adequate understanding to prevent operat...

Страница 16: ...oducing components such as resistors regulators and the like F Conduit And Raceway Installation 1 Design lay out size and plan new conduit and raceway systems as required 2 Indoor Requirements a Route exposed conduit and raceway parallel and perpendicular to walls and adjacent piping b Maintain minimum a six 6 inch clearance between conduit and piping c Group conduit in parallel runs where practic...

Страница 17: ...ltage plug in transformers to outlet with screw or strap Clearly label all transformers to identify purpose and use K Cutting And Patching The Contractor shall be responsible for all cutting fitting or patching that may be required to complete the Work L Painting All conduit fittings and junction boxes shall be painted to match the existing surfaces they are mounted on This work may be performed a...

Отзывы: