PREFACE ............................... 4-1
Flowchart .......................... 4-1
B. Initial Checks .................... 4-3
C. Service Checkpoints .......... 4-3
D. Service Mode ..................... 4-5
PAPER JAMS .......................... 4-9
TROUBLESHOOTING .............. 4-12
TROUBLESHOOTING .............. 4-13
TROUBLESHOOTING .............. 4-14
ADJUSTMENT ........................ 4-17
A. Mechanical Adjustment ..... 4-17
B. Electrical Adjustment........ 4-17
C. LEDs, test pins, jumpers, and
switches on PCB ................ 4-17
SERVICING............................. 4-20
Parts ................................. 4-20
Consumable Parts .............. 4-20
Schedule ........................... 4-20
D. Standard Tools .................. 4-20
E. Special Tools ..................... 4-20
Cleaners ............................ 4-20
VIII. LOCATION OF CONNECTORS.. 4-21
LIST OF SIGNALS ................... A-3
A. Input/output signals to paper
Содержание PD-82
Страница 8: ......
Страница 14: ......
Страница 16: ......
Страница 28: ......
Страница 30: ......
Страница 34: ...5 Rear cover 1 Remove the 4 screws and then the rear cover Screws Rear cover Figure 3 2 6 3 4 CHAPTER 3 ...
Страница 37: ...IV MAIN PARTS A Locations Lifter Figure 3 4 1 3 7 CHAPTER 3 ...
Страница 48: ...VII SOLENOID CLUTCH A Locations Pick up solenoid Registration clutch Figure 3 7 1 3 18 CHAPTER 3 ...
Страница 50: ...VIII MOTORS A Locations Lifter motor Pick up motor Feed motor Figure 3 8 1 3 20 CHAPTER 3 ...
Страница 58: ......
Страница 62: ...Figure 4 1 2 1 Pick up roller 2 Feed roller 3 Separation roller 4 4 CHAPTER 4 ...
Страница 80: ......
Страница 81: ...APPENDIX I GENERAL CIRCUIT DIAGRAM A 1 II LIST OF SIGNALS A 3 ...
Страница 82: ......
Страница 84: ......
Страница 88: ...PRINTED IN JAPAN IMPRIME AU JAPON 0199AB0 70 CANON INC The printing paper contains 70 waste paper ...