6
6
6-7
6-7
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
Installation > Installation Procedure > Preparation for Installation on Upstream Connection Machine Side
Installation Procedure
Preparation for Installation on Upstream Connection Machine Side
1) .Remove two covers.
2) Secure the two bundled clamp plates and positioning pin to the host machine
each with two bundled RS tight screws(M4 x 8).At this time,secure the supplied
ground plate along with the rear latch catch.
x6
F-6-6
F-6-6
F-6-7
F-6-7
Содержание K1
Страница 4: ...0 0 ...
Страница 10: ...1 1 Product Outline Product Outline Features Specifications Names of Parts ...
Страница 15: ...2 2 Technology Technology Basic Configuration Controls Jam Detection Power Supply Work of service ...
Страница 34: ...3 3 Periodic Servicing P e r i o d i c Servicing Periodic services items ...
Страница 69: ...5 5 Adjustment Adjustment Adjustment at Time of Parts Replacement ...
Страница 90: ...7 7 Appendix Appendix Service Tools General Circuit Diagram ...