6
6
6-5
6-5
Installation > Unpacking > Unpacking Procedure
Installation > Unpacking > Unpacking Procedure
Unpacking
Unpacking Procedure
MEMO
The equipment ships, secured by tapes, cush
-
ioning and other materials to protect it from
viration and impact during transit. Remove
all such tapes and cushioning materials as in-
structed below before installing the equipment.
(Keep all the shipping fixtures and cushion
-
ing materials in a safe place for later reuse in
reshipping the equipment, as for relocation and
repairs.)
1) Take out the accessory ox from the package.
CAUTION
Leave the four cushioning materials attached to the inserter in position.
Removing the cushioning materials could result in a deformation of the mounting portion or elsewhere.
F-6-2
F-6-2
Содержание K1
Страница 4: ...0 0 ...
Страница 10: ...1 1 Product Outline Product Outline Features Specifications Names of Parts ...
Страница 15: ...2 2 Technology Technology Basic Configuration Controls Jam Detection Power Supply Work of service ...
Страница 34: ...3 3 Periodic Servicing P e r i o d i c Servicing Periodic services items ...
Страница 69: ...5 5 Adjustment Adjustment Adjustment at Time of Parts Replacement ...
Страница 90: ...7 7 Appendix Appendix Service Tools General Circuit Diagram ...