
4. VERIFICATION AFTER REPAIR
4-1. Standard Inspection Flow
In each step below, confirm that printing is performed properly and the printer operates properly without any
strange noise.
iX6500 series
TABLE OF CONTENTS
EEPROM information print
<Check point>
- The information must be printed properly.
<Additional verification to be made> See
2-1. Major Replacement Parts and
Adjustment
.
-
At logic board replacement
-
At absorber kit replacement
-
At platen unit or spur unit replacement
Integrated inspection pattern print
<Check point>
- The pattern must be printed properly.
Communication with a connected PC
<Check point>
- Via USB connection to the PC, printing from the PC must be performed properly
(paper feeding from the rear tray).
Power-off in the service mode
<Check point>
- The paper lifting plate must be in the raised position.
External and internal appearance
<Check point>
- No grease, oil, or smearing on the timing slit strip film.
- No lifting of the platen ink absorber.
- No foreign material or dislocation of any part inside the printer.
- No damage or scratches that will affect the functionality.
Packaging
<Check point> See
6. MACHINE TRANSPORTATION
.
- The carriage must be locked in the home position.
45 / 52
Содержание iX6500 Series
Страница 19: ...5 Remove the panel cover unit R 1 screw 15 52...
Страница 21: ...4 Remove the printer unit 6 screws Lift the printer unit Specific screw location 17 52...
Страница 32: ...10 Cable wiring and connection 1 Logic board and spur unit 28 52...
Страница 38: ...2 Service Tool functions Service Tool screen Version 2 000 34 52...
Страница 39: ...35 52...
Страница 50: ...4 2 Integrated Inspection Pattern Print Print sample 46 52...
Страница 51: ...4 3 Ink Absorber Counter Value Print Print sample 4 VERIFICATION AFTER REPAIR 47 52...
Страница 54: ...50 52...