■ Procedure
1. Remove the Front Tray Rack [1] / Rear Tray Rack [2].
[1]
[2]
NOTE:
How to assemble the Front Tray Rack and Rear Tray Rack
1. Insert the Front Tray Rack [1] and Rear Tray Rack [2]
at the Guide.
2. Release the latch and move the Tray Rack to the
bottom.
3. Check the phase position between the Front Tray
Rack [1] and Rear Tray Rack [2] with the lines marked
[3] on them. When the phase position is differ, follow
the step 1) again.
[1]
[2]
[A]
[B]
2. Remove the Cable Guide [1].
• 1 Screw [2]
• 3 Connectors [3]
• 2 Cables [4]
1x
2x
3x
[1]
[2]
[3]
[4]
3. Remove the Tray Shift Motor Unit [1].
• 3 Screws [2]
[2]
[1]
3x
4. Remove the E-ring [1] and the Gear [2] and the Pin
[3].
[3]
[1]
[2]
4. Parts Replacement and Cleaning
56
Содержание Inner Finisher-K1
Страница 1: ...Revision 3 0 Inner Finisher K1 Service Manual ...
Страница 10: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Страница 23: ...PS1 M1 Paddle M10 Inlet Roller Delivery Roller Processing Tray Unit M1 Paddle Unit 2 Technical Explanation 17 ...
Страница 40: ...Related error code E516 0001 Paddle motor error E516 0002 Paddle motor error 2 Technical Explanation 34 ...
Страница 47: ...Periodical Service 3 Periodic Servicing Tasks 42 ...
Страница 74: ...Adjustment 5 Overview 69 Basic Adjustment 71 Adjustment when Replacing the Parts 86 Service Label 87 ...
Страница 94: ...Troubleshooting 6 Making Initial Checks 89 Processing Tray Area 90 ...
Страница 109: ...11 1x 12 7 Installation 103 ...
Страница 112: ...APPENDICES Service Tools 107 General Circuit Diagram 108 ...