Unpacking
Unpacking Procedure
NOTE:
This equipment is packed using tapes, fixings and cushioning materials to be protected vibration and shock during transportation.
Be sure to remove all the fixing materials and the tapes before starting to install this equipment. It is a good idea to store away
theremoved fixings and cushioning materials for possible relocation of this equipment, e.g., to new site or for repairs.
1.
Take out the finisher from the carton.
NOTE:
The weight of this equipment is about 7.0kg.
2.
Remove all the tapes and the cushioning materials outside this equipment.
3.
4.
7. Installation
94
Содержание Inner Finisher-K1
Страница 1: ...Revision 3 0 Inner Finisher K1 Service Manual ...
Страница 10: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Страница 23: ...PS1 M1 Paddle M10 Inlet Roller Delivery Roller Processing Tray Unit M1 Paddle Unit 2 Technical Explanation 17 ...
Страница 40: ...Related error code E516 0001 Paddle motor error E516 0002 Paddle motor error 2 Technical Explanation 34 ...
Страница 47: ...Periodical Service 3 Periodic Servicing Tasks 42 ...
Страница 74: ...Adjustment 5 Overview 69 Basic Adjustment 71 Adjustment when Replacing the Parts 86 Service Label 87 ...
Страница 94: ...Troubleshooting 6 Making Initial Checks 89 Processing Tray Area 90 ...
Страница 109: ...11 1x 12 7 Installation 103 ...
Страница 112: ...APPENDICES Service Tools 107 General Circuit Diagram 108 ...