![Canon imagepress C7010VP Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/canon/imagepress-c7010vp/imagepress-c7010vp_program-manual_4114786010.webp)
imagePRESS C7010VP/C7010VPS Series Durability Enhancement Program Guide
imagePRESS C7010VP/C7010VPS Series Durability Enhancement Program Guide
Page 6
July 2012
IV. DEP Parts Installation Requirements
A. Estimated Parts Costs and Installation Times
A significant part costs and labor time is required to complete the DEP parts
replacement (refer to the table below). When scheduling DEP service with the
customer, consider the estimated time required for each area to be serviced. To
reduce inconvenience to the customer, the complete DEP Service may be
divided into smaller stages (that can be completed over a period of weeks) based
on the areas to be serviced and output quality need.
Main Unit (Table 5)
Description
Estimated
Replacement
Interval
Approximate
Number of Items
Approximate
Installation Time
Image Processing Kit
9 million
30
7.5 hours
Paper Feed Unit Kit
7
1 hour
(Per paper deck)
Vertical Path Unit Kit
7
3 hours
Upper Feed Unit Kit
21
3.5 hours
Lower Feed Unit Kit
15
4.5 hours
B. Installation Guide
The DEP Installation Guide for the imagePRESS C7010VP/C7010VPS Series
details the steps required to install the DEP Parts provided by Canon USA. The
Installation Guide is available on the Canon
C. Special Tools, Solvents & Oils
The tools, solvents and oils required to install/replace DEP parts are the same as
the standard tools used to service the imagePRESS C7010VP Series and
imagePRESS C7010VPS Series. Reference the imagePRESS Service Guide
and Service Manual for a list of required service tools, solvents and oils.
2
The approximate installation time of DEP parts is based on one (1) experienced service technician. Two or more experienced
service technicians it will reduce the approximate installation time considerably.
Содержание imagepress C7010VP
Страница 1: ...Durability Enhancement Program Guide ...