Making Checks after
Completion of Installation
Work
Disposal Parts Check
1. Following disposal parts are remained after
completion of the installation work.
[1] Sensor Flag of the Delivery Tray Full Detection
Sensor1 1pc.
[2] Face Cover 1pc.
[3] Face Cover 1pc.
[4] Subtray 1pc.
[5] Inner Cover (Upper) 1pc.
[6] Inner Cover (Lower) 1pc.
[7] Inner Face Seal 1pc
[8] Screw (RS Tightening ; M3x8) 2pcs.
[9] Left Upper Cover 1pc.
[10] Protection Sheet 1pc.
[11] Face Seal (White) 2pcs.
Operation Check
1. Turn ON the main power of the Host Machine after
installing the Finisher.
2. Check the operation such as paper feed to make
sure that problems such as a jam or malfunction do
not occur.
6. Installation
41
Содержание Buffer Pass Unit-N1
Страница 8: ...Product Overview 1 Specifications 4 Name of Parts 5 ...
Страница 18: ...Periodical Service 3 Periodical Service Operation Item 14 ...
Страница 25: ...13 Remove the 2 screws 1 2x 1 14 Remove the Buffer Pass Unit 2 Hooks 1 2x 1 4 Disassembly Assembly 20 ...
Страница 33: ...Adjustment 5 Basic Adjustment 29 ...
Страница 34: ...Basic Adjustment Basic Adjustments Buffer pass unit does not have adjustment work 5 Adjustment 29 ...
Страница 47: ...APPENDICES Service Tools 43 General Circuit Diagram 44 ...