18. Remove the Left Upper Cover, which excluded in
procedure 11.
• 1 Screw
• 3 Hooks
1x
19. Install the Buffer Pass Left Upper Cover to the Left
Upper Cover Unit.
NOTE:
Protection Sheet of Buffer Pass Left Upper Cove is
removed at later procedure.
• 3 Hooks
• 1 Screw (P Tightening ; M4x10)
1x
20. Install the Left Cover.
• 3 Screw (RS Tightening ; M3x8)
3x
21. Install the Left Upper Cover Unit.
• 4 Claws
• 1 Screw (RS Tightening ; M3x8)
1x
6. Installation
38
Содержание Buffer Pass Unit-N1
Страница 8: ...Product Overview 1 Specifications 4 Name of Parts 5 ...
Страница 18: ...Periodical Service 3 Periodical Service Operation Item 14 ...
Страница 25: ...13 Remove the 2 screws 1 2x 1 14 Remove the Buffer Pass Unit 2 Hooks 1 2x 1 4 Disassembly Assembly 20 ...
Страница 33: ...Adjustment 5 Basic Adjustment 29 ...
Страница 34: ...Basic Adjustment Basic Adjustments Buffer pass unit does not have adjustment work 5 Adjustment 29 ...
Страница 47: ...APPENDICES Service Tools 43 General Circuit Diagram 44 ...