Controls
Controls
Item
Reference
Basic Operation
Outline
Feeding Unit
Outline
Basic Operation
Feed Switch Operation
“Feed switch operation” on page 33
Shift Operation
Buffer Operation
Stack/Escape Tray Unit
Outline
Stack Tray Up and Down Movement
“ Stack Tray Up and Down Movement” on page 41
Stack Tray Delivery Paper Surface Detection,
Paper Full
“Stack Tray Delivery Paper Surface Detection, Paper
Full” on page 42
Escape Tray Paper Full Detection
“Escape Tray Paper Full Detection” on page 45
Processing Tray Unit
Outline
Stacking Operation
“Stacking Operation” on page 47
Alignment/Shifting Operation
“Alignment/Shifting Operation” on page 50
Staple Operation
“ Staple Operation” on page 52
Staple-free Binding Operation
“ Staple-free Binding Operation” on page 55
Stack Delivery Operation
“ Stack Delivery Operation” on page 58
Saddle Stitcher Unit
Outline
Configuration
Basic Operation
Stacking Operation
“ Stacking Operation” on page 62
Paper Stack Feed Operation
“Paper Stack Feed Operation” on page 64
Stitch Operation
Paper Folding/Delivery Operation
“Paper Folding/Delivery Operation” on page 65
Buffer Pass Unit
Outline
Fan Operation
Jam Detection
Outline
Jams
Power Supply
Power Supply Route
“Power Supply Route” on page 73
Protective Functions
“Protection Function” on page 73
Upgrading
2. Technical Explanation
25
Содержание Booklet Finisher-AA1
Страница 1: ...Revision 4 0 Staple Finisher AA1 Booklet Finisher AA1 Service Manual ...
Страница 12: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 14 Optional Configuration 20 ...
Страница 83: ...Periodical Service 3 Periodic Servicing Tasks 76 ...
Страница 87: ...3 Remove the 2 Connectors 1 2x 1 4 Parts Replacement and Cleaning 79 ...
Страница 89: ...Main Units Parts 4 5 6 7 8 1 2 3 4 Parts Replacement and Cleaning 81 ...
Страница 128: ...4x 1 2 2 3 3 2x 4 Parts Replacement and Cleaning 120 ...
Страница 150: ...Adjustment 5 Overview 143 Basic Adjustment 148 Adjustments When Replacing Parts 173 Other 184 ...
Страница 178: ...A B Feed Direction Stapling Position Fixing Screw A B Stitcher Unit Fixing Screw Fixing Screw Mark 5 Adjustment 170 ...
Страница 184: ... Adjsting Phase Angle of the Paddle Unit 1 Put off the belt 1 1 2 Lower the swing roller till its end 5 Adjustment 176 ...
Страница 193: ...Troubleshooting 6 Making Initial Checks 186 Processing Tray Area 187 Saddle Stitcher Area 188 ...
Страница 204: ...4 5 6 7 8 9 7 Installation 196 ...
Страница 205: ...10 7 Installation 197 ...
Страница 210: ...11 NOTE Keep the parts as illustration above Installation of Buffer Pass Unit 1 7 Installation 202 ...
Страница 223: ...2 3 2x 7 Installation 215 ...
Страница 224: ...APPENDICES Service Tools 217 General Circuit Diagram 218 ...