Unpacking Procedure
Unpacking Procedure
1. Open the container box, and then take out the Punch
Unit and the contents.
2. Remove all cushioning materials and tapes from
outside of the punch unit.
3.
Remove the two fixtures.
• 3 Screws
NOTE:
Removed screws are used for Installation Procedure.
3x
6. Installation
53
Содержание 2/3 Hole Puncher Unit-A1
Страница 1: ...Revision 1 0 2 3 Hole_2 4 Hole_4 Hole Puncher Unit A1 Service Manual ...
Страница 10: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 9 ...
Страница 21: ...4 The paper is fed to the finisher feeding unit Paper 2 Technical Explanation 15 ...
Страница 24: ...4 The paper is fed to the finisher feeding unit Paper 2 Technical Explanation 18 ...
Страница 41: ...Periodical Service 3 Periodical Service Operation Item 36 ...
Страница 43: ...Disassembly Assembly 4 List of Parts 38 Motor 40 PCB 41 ...
Страница 49: ...Adjustment 5 Basic Adjustments 44 Adjustments When Replacing Parts 48 ...
Страница 70: ...APPENDICES Service Tools 65 General Circuit Diagram 66 ...