GENERAL
THIS HEATER SHALL ONLY BE INSTALLED BY AN AUTHORIZED
PERSON. THIS APPLIANCE SHALL BE INSTALLED IN ACCORDANCE
WITH THE MANUFACTURERS INSTALLATION INSTRUCTIONS, AG 5601,
MUNICIPAL BUILDINGS CODES, ELECTRICAL WIRING REGULATIONS
AND ANY OTHER STATUTORY REGULATIONS.
TO CONFORM WITH THE AUSTRALIAN STANDARDS APPROVAL
REQUIREMENTS, THE SPACERS MUST BE PERMANENTLY FITTED
TO MAINTAIN THE REQUIRED CLEARANCE FROM COMBUSTIBLE
MATERIALS.
THESE MOCK FIREPLACE INSTALLATION INSTRUCTIONS AND
SAFETY WARNINGS SHALL BE READ IN CONJUNCTION WITH THE
HEATER INSTALLATION BOOKLET AND THE SAFETY WARNING IN
THAT MANUAL. (SEE PAGES 3&4)
Page 1.
IMPORTANT NOTE:
WHEN INSTALLING THIS POWER FLUE HEATER INTO A MOCK
FIREPLACE , A MOCK FIREPLACE INSTALLATION KIT MUST BE USED.
FOR INSTALLATION INTO A (MOCK) COMBUSTIBLE FIREPLACE
CONSTRUCTED FROM TIMBER AND / OR PLASTERBOARD, THE FLUE
WILL NEED TO BE SUPPORTED TO MAINTAIN MIN CLEARANCES
FROM
ANY COMBUSTIBLE MATERIALS
.
THE HEATER MUST BE INSTALLED WITH IT’S INTEGRAL FLUE
CORRECTLY INSTALLED (SEE INSTALLATION INSTRUCTION BOOKLET)
FOR THIS HEATER TO OPERATE PROPERLY. IF THE FLUE SYSTEM
IS NOT CORRECTLY INSTALLED AND MAINTAINED, POISONING BY
CARBON MONOXIDE (CO) COULD RESULT AND POSSIBLY CAUSE
DEATH.
THE APPLIANCE SHOULD BE INSPECTED PRIOR TO USE, WITH
REGULAR INSPECTIONS (ANNUALLY) TO BE MADE BY A LICENSED
SERVICE PERSON. IT IS IMPORTANT THAT CIRCULATING AIR
PASSAGEWAYS OF THE APPLIANCE BE KEPT CLEAN, DIRT AND LINT
FREE, FOR A SAFE AND EFFICIENT OPERATION OF THE HEATER.
SAFETY WARNINGS
MAINTENANCE
IF YOUR HEATER REQUIRES ATTENTION CONTACT:
SAMPFORD AND STAFF PTY LTD
ON
PH 1300 727 421
FAX 1300 727 425
Page 8.
Содержание FFITZROY PROFILE PWR
Страница 9: ...INSTALLATION DETAIL Page 7 REFER TO THE INSTALLATION BOOKLET SUPPLIED WITH THE HEATER...
Страница 11: ...NOTES 5 Page 9...
Страница 12: ...REF F3084 C REVISION C DATED FEB 2007...