Candela Corporation
M
GentleLASE
Bubble Circuit Calibration Procedure
8503-01-0830, Revision A
Candela Corporation Proprietary
Page 1 of 5
Bubble Circuit
Calibration Procedure
Страница 1: ...Candela Corporation MGentleLASE Bubble Circuit Calibration Procedure 8503 01 0830 Revision A Candela Corporation Proprietary Page 1 of 5 GentleLASE Bubble Circuit Calibration Procedure...
Страница 2: ...MGentleLASE Bubble Circuit Calibration Procedure Candela Corporation Page 2 of 5 Candela Corporation Proprietary 8503 01 0830 Revision A...
Страница 3: ...sure the cryogen tank is fully warmed usually 10 15 minutes with all the covers on the laser is sufficient to bring the tank to 120PSI If tank is warm and bubbles persist the cryogen tank is probably...
Страница 4: ...bulkhead connector Remove the canister from the DCD Option Assembly Wait 1 minute Verify the voltage on the CPU I O PCB at TP29 and TP31 is greater than 10 50 VDC Also verify that the maintenance TOGG...
Страница 5: ...Candela Corporation MGentleLASE Bubble Circuit Calibration Procedure 8503 01 0830 Revision A Candela Corporation Proprietary Page 5 of 5...