12 Trouble Shooting 

 

  15 / 18 

 

12 Trouble Shooting 

When inverter does not operate normally, we recommend the following actions for quick troubleshooting. Please 
review the error list table carefully.   

12.1 Warning 

The different LED colors and flashing status identify the current operation statuses of the inverter. If the red color is 
always on, it indicates the inverter fault. Usually the warnings can be cleared through an orderly shutdown / reset or a 
self-corrective action performed by the inverter. 

12.2 Errors 

Error codes identify a possible equipment fault, or incorrect setting/ configuration. Any and all attempts to correct or 
clear a fault must be performed by qualified personnel. Typically, the Errors code can be cleared once the cause or 
fault is removed.   
However, some of the (E) codes may cannot be cleared, in this case please contact the dealer or Canadian Solar to 
replace a new one.   
Errors as indicated in the table below:   

Error Code 

Error Message 

Suggestion 

F-100 

Over temperature 

1. Check heatsink for obstructions/ventilation. 
2. Check the ambient temperature around the inverter. 

F-101 

High DC input voltage 

1. Disconnect the DC switch, remove the DC connector, measure the voltage of the PV string, and 
check if it exceeds the input-voltage specification of the inverter.   
2. If exceed the specification, re-layout the PV module string.   
3. If not exceed the specification, while the error still exits, please contact Customer Service.   

F-103 

Unconnected grid 

1. Turn off DC switch, remove AC connector, measure the voltage between fire line and the zero 
line, then check if it is consistent with the grid-connected specification of inverter.   
2. Inconsistent, check if the AC main switch is connected, check if the power supply is normal 
working.   
3. Consistent, connect the AC connector, turn on the DC Switch. 
4. If error message still exists, contact Customer service. 

F-104 

Inverter grid-connected 
relay fault 

Contact Customer service.   

F-105 

Grid frequency fault 

1. If power grid frequency returns to normal, the inverter will restore the grid connection 
automatically.   
2. If error message still exists, contact Customer service.   

F-106 

Grid voltage fault 

1. Turn off DC switch, remove AC connector, measure the voltage between fire line and the zero 
line, then check if it is consistent with the grid-connected specification of inverter. 
2. Inconsistent, check the grid layout. 
3. Consistent, connect the AC connector, turn on DC Switch, inverter will restore the grid 
connection automatically.   
4. If error message still exists, contact Customer service.   

F-107 

DC component over range 

1. Restart inverter. 
2. If error message still exists, contact Customer service. 

F-108 

Current sensor fault 

1. Wait until inverter restores normal work. 
2. If error message still exists, contact Customer service. 

F-110 

Leakage current detection 
unit fault 

1. Check if there is any PV cable breakage. 
2. Check if the PV modules grounding improperly.   
3. Restart inverter. 
4. If error message still exists, contact Customer service. 

F-111 

Leakage current fault 

1. Check if PV strings grounding properly.   
2. If error message still exists, contact Customer service. 

Содержание CSI-7K-S22002-ED

Страница 1: ...CSI 7K S22002 ED CSI 8K S22002 ED CSI 9K S22002 ED PV Inverter User Manual Part No 2809001100 Release Date September 2020...

Страница 2: ...t Introduction 3 3 2 Appearance 3 3 3 Product Nameplate 4 4 Storage 4 5 Unpackaging and Inspection 5 6 Installation 5 6 1 Basic Installation Requirements 5 6 2 Mounting Wall mounting Bracket 7 6 3 Ins...

Страница 3: ...nance 14 12 Trouble Shooting 15 12 1 Warning 15 12 2 Errors 15 13 Handling the Inverter 16 13 1 Removing Inverter 16 13 2 Packing Inverter 16 13 3 Disposing Inverter 16 ANNEX A Acronyms and Abbreviati...

Страница 4: ...roduct lists and documents published on our website at http www canadiansolar com as these lists are updated on a regular basis 1 3 Limitation of Liability Canadian Solar Inc shall not be held respons...

Страница 5: ...iar with the safety specification about the electrical system 3 Be familiar with the local requirements rules and regulations 4 Understand the composition and working principles of the grid tied PV sy...

Страница 6: ...odules DC switch inverter AC switch electricity meter and local grid The PV power system diagram is shown as FIG 3 1 KWH PV Modules DC Switch Inverter AC Switch Electricity Meter Utility Grid FIG 3 1...

Страница 7: ...k the inverter Storage temperature 40 C 70 C Storage humidity 0 100 RH Non Condensing The stored warehouse should be clean well ventilated and non corrosive gas meanwhile it should be in a state of un...

Страница 8: ...st be strong enough to bear the inverter s weight for a long period time Please check the inverter s weight in the product specification of ANNEX B 3 The inverter is protected to IP65 can be installed...

Страница 9: ...ode Recommended 12 Install the inverter vertically or at a maximum backward tilted angle of 15 degrees to facilitate heat dissipation 15 FIG 6 5 Installation Angle Requirements 13 Do not install the i...

Страница 10: ...G 6 6 237 45 164 74 5 250 374 45 164 74 5 250 FIG 6 6 Drilling Positions W x H 399 x 583mm 2 Knock expansion anchors into the corresponding four holes and then fix the wall mounting bracket to the wal...

Страница 11: ...supplied 7 3 Meter CT Connection Optional The inverter has integrated export limitation functionality To use this function a power meter or a CT must be installed For installation and operation metho...

Страница 12: ...I Install an independent two pole circuit breaker at the output side of the inverter for protection the recommended AC circuit breaker specifications are as follows Inverter type AC circuit breaker sp...

Страница 13: ...to the polarities to make sure the correct assembling FIG 7 7 AC receptacle FIG 7 8 Installing the AC Connector 7 6 Wiring DC Input Note The DC connectors are in paired negative and positive ones Pay...

Страница 14: ...e crimping pliers as per FIG 7 12 Ensure the conductors completely wrapped without loosening or damage FIG 7 11 Strip the Cable Insulating Layer FIG 7 12 Crimp the Contact 3 Insert the crimped contact...

Страница 15: ...with a RS485 to usb port converter via RS485 serial line and then connect this module to PC 9 Commissioning Inverter 9 1 Checking Electrical 1 Check PE connections with multi meter To make sure all th...

Страница 16: ...enerated by the PV modules If such fault occurs frequently please contact the maintenance personnel Note For the monitoring and local APP information please refer to documents published on our website...

Страница 17: ...pments or the more recent revision of the manual with has been clearly and thoroughly understood Items Methods Period System clean Check the temperature and dust of the inverter Clean the inverter enc...

Страница 18: ...ted grid 1 Turn off DC switch remove AC connector measure the voltage between fire line and the zero line then check if it is consistent with the grid connected specification of inverter 2 Inconsisten...

Страница 19: ...y error Minor F 118 Power grid voltage detection consistency error Minor F 123 Secondary memory failure 1 Restart the inverter 2 If error message still exists contact Customer service F 124 Clock fail...

Страница 20: ...packet radio service LED light emitting diode MPPT maximum power point tracking PC personal computer PE protecting earthing PV photovoltaic RCD residual current protective device RCM residual current...

Страница 21: ...an Efficiency 97 5 97 5 97 5 MPPT Efficiency 99 9 99 9 99 9 Safety Protection DC SPD Type II DC Switch Integrated Anti Islanding Protection Integrated DC Reverse Protection Integrated Insulation Monit...

Страница 22: ...ng CT sensor FIG1 Outline and Dimensions of CT 3 CT installation 3 1 System diagram L N PE L N PE CT CT METER L N PE Load FIG 2 Electrical and signal connection diagram 3 2 Wiring signal cable 3 2 1 W...

Страница 23: ...t slipping as per FIG 9 4 Check the current and current direction turn on power FIG 7 Open the buckle FIG 8 Install the CT FIG 9 Fix the CT 3 4 Setting on the inverter default setting is OFF 1 Enter C...

Страница 24: ...iagram Note The meter has to be installed to the grid side L L N N 5 6 7 8 L N PE L N PE L N PE Load CT Meter FIG 2 Electrical and Signal Connection Diagram 3 2 Wiring signal cable 3 2 1 Wiring signal...

Страница 25: ...Pro APP 2 Enter the Local Mode as per FIG 8 3 Scan the QR code of WiFi stick or input the serial number of WiFi stick manually Then connect to the AP of WiFi stick as per FIG 9 4 Enter the Parameters...

Страница 26: ...6 P 1 519 837 1881 F 1 519 837 2550 Sales Inquiries Email info canadiansolar com Customer Support Email service ca canadiansolar com This manual is subject to change without prior notification Copyrig...

Отзывы: