5.4.3.2.1 Detection of leakage to ground

Canadian Solar inverters are transformer-less  and do not have an array connection to ground.  

Any measurement of a fixed voltage between ground and either the positive or negative string 

wiring indicates a leakage (ground fault) to ground and must be corrected prior to energizing 

the inverter or damage to the inverter may result.

Measure VAC and verify voltage is within local grid standards.

       1).  Measure each phase to ground (L-G).

       

5.4.4.1 Measure Vac and frequency

       2).  Measure phases to the other phases in pairs (L-L).  PH A to PH B, PH B to PH C and 

             PH C to PH A.

       3).  If the meter is equipped, measure the frequency of each phase to ground.

       4).  Ensure each measurement is within local grid standards and the inverter specifications 

             as noted in section 10 “Specifications”.

A phase rotation test is recommended to ensure the phases have been connected in the 

appropriate order. Canadian Solar inverters do not require a

specific phase rotation connection.  

However, the local utility may require a specific phase rotation or a record of the phase 

configuration of the installation.

5.4.4.2 Phase rotation test

Verify AC configuration.

5.4.4 AC configuration

5. Commissioning

6. Start and Shutdown

6.1 Start-up procedure

To start-up the inverter, it is mandatory that the steps below are followed in the exact order 

outlined.

        1).  Ensure the commissioning checks in Section 5 have been performed.

        2).  Switch the AC switch ON.

        3).  Switch the DC switch ON. If the PV array (DC) voltage is higher than the inverter's 

              start-up voltage, the inverter will turn on. The red DC POWER LED and LCD will be 

              continuously lit.

        4).  Canadian Solar inverters are powered from the DC side. When the inverter detects DC 

              power that is within start-up and operating ranges, the inverter will turn on. After turn-

              on, the inverter will check internal parameters, sense and monitor AC voltage, hertz 

              rate and the stability of the supply grid. During this period, the green   OPERATION LED 

                will flash and the LCD screen will show INITIALIZING. This tells the operator that the 

              inverter is preparing to generate AC power.

        5).  After the locally mandated delay (300 seconds for IEEE-1547 compliant inverters), the 

              inverter will start generating AC power. The green OPERATION LED will light 

              continuously and the LCD screen will show GENERATING.

CAUTION

The inverter's surface temperature can reach up to 75

 (167

 F). To 

avoid risk of burns, do not touch the surface when the inverter is in 
the operational mode. Additionally, the inverter must be installed 
out of the reach of children.

6.2 Shutdown procedure

To stop the inverter, it is mandatory that the steps below are followed in the exact order outlined.

       1. Select "Grid Off" in the Advanced Setting of Inverter LCD.

       2.  Turn off the AC Switch between Canadian Solar inverter and Grid.

       3.  Wait approximately 30 seconds (during this time, the AC side capacitors are dissipating 

           energy). If the inverter has DC voltage above the start-up threshold, the red POWER 

           LED will be lit. Switch the DC switch OFF.

       4.  Confirm all LED's switch OFF (~one (1) minute).

CAUTION

Although the inverter DC disconnect switch is in the OFF position and all 
the LED's are OFF, operators must wait five (5) minutes after the DC power 
source has been disconnected before opening the inverter cabinet. DC 
side capacitors can take up to five (5) minutes to dissipate all stored energy.

Содержание CSI-25K-T220GL03-E

Страница 1: ...ail sales au csisolar com Customer Support Email service au csisolar com South East Asia 101 Thompson Road 15 03 United Square Singapore 307591 P 65 6572 905 F 65 6559 4690 Sales Inquires Email sales...

Страница 2: ...Shutdown 6 1 Start up procedure 6 2 Shutdown procedure 39 39 39 7 1 Main Menu 40 42 7 2 1 Lock screen 40 7 2 Information 4 1 Inverter monitoring connection 28 7 Normal operation 40 4 2 DRM Connection...

Страница 3: ...n Solar distributor Cross screws M4 14 x4 Cross Recessed Hexagon Bolt M6 12 x2 User manual x1 Manual AC terminal cover x1 DC connectors 25 30 K x8 50K x10 60K x12 4pin COM Port 16pin COM Port 16pin CO...

Страница 4: ...tallations must be done in accordance with local and national electrical safety standards 1 3 Storage 2 Safety Instructions WARNING To reduce the risk of fire branch circuit over current protective de...

Страница 5: ...ff before the DC Switch is turned off 2 3 Notice for use 2 Safety Instructions 3 1 Environmental considerations 3 1 1 Select a location for the inverter When selecting a location for the inverter cons...

Страница 6: ...electricity supply the sound level from the inverter can be quite high 3 2 Product handling Figure 3 3 Handles used to move the inverter shown circled in red 3 1 2 4 Air circulation Do not install in...

Страница 7: ...ally The steps to mount the inverter are listed below 1 Refer to Figure 3 6 drill holes for expansion bolt M10 90 based on the hole diameter of bracket using a precision drill keeping the drill perpen...

Страница 8: ...from vertical The steps to mounted to the rack are listed below 3 Install mounting plate 1 Remove the bracket and fasteners from the packaging Mark the position for hole drilling according to the hol...

Страница 9: ...he Grid Supply Main Switch AC OFF 2 Switch the DC Isolator OFF 3 Connect the inverter to the grid 4 Assemble PV connector and connect to the Inverter Inverter design uses PV style quick connect termin...

Страница 10: ...nding 2 Prepare OT terminals M10 To effectively protect the inverter two grounding methods must be performed Connect the AC grounding cable Please refer to section 3 4 3 Connect the external grounding...

Страница 11: ...This can cause serious damage to the inverter WARNING MAKE SURE the polarity of the PV array output conductors matches the DC and DC terminal labels before connecting these conductors to the terminal...

Страница 12: ...d between the inverter and the grid Table 3 2 Rating of grid OCPD 3 4 3 1 Connecting the inverter to the utility grid All electrical installations must be carried out in accordance with the local stan...

Страница 13: ...n use a hydraulic crimp tool to crimp the terminal The crimped portion of the terminal must be insulated with heat shrinkable tube or insulating tape 1 Strip the end of AC cable insulating jacket abou...

Страница 14: ...12 5 13 6 14 7 15 8 16 Meter RS485 B DRM 2 6 COM1 485 A DRM 3 7 COM1 485 B DRM 4 8 RefGen COM2 485 A Com DRM0 COM2 485 B V 12V V GND Figure 4 1 16pin COM Connector The following is the assembly diagra...

Страница 15: ...box or any compatible 3rd party monitoring devices PPC or plant SCADA 4 Comm Monitoring 4 Comm Monitoring 29 28 4 1 Inverter monitoring connection Canadian Solar can provide optional accessories such...

Страница 16: ...Comm Monitoring 4 Comm Monitoring 31 30 NOTE The PLC communication can not work with RS485 communication at the same time If already installed the PLC CCO for PLC communication on site then the RS485...

Страница 17: ...n Connector 4 3 Meter Connection The inverter can work with a three phase smart meter to achieve Export Power Management function and or 24hour consumption monitoring function The Pin 1 and Pin 2 of t...

Страница 18: ...service technicians only The inverter is customized according to the local grid standard before shipping There should be no requirement to set the standard NOTE The User Def function can only be used...

Страница 19: ...the inverter see Specifications in section 10 may damage the inverter Although Canadian Solar inverters feature reverse polarity protection prolonged connection in reverse polarity may damage these p...

Страница 20: ...ed DC POWER LED and LCD will be continuously lit 4 Canadian Solar inverters are powered from the DC side When the inverter detects DC power that is within start up and operating ranges the inverter wi...

Страница 21: ...1 Information list Status Generating Power 0000W Grid Frequency F_Grid 00 00Hz Total Energy 0000000 kwh This Month 0000kwh Last Month 0000kwh Today 00 0kwh Yesterday 00 0kwh 10 sec 10 sec 10 sec 10 s...

Страница 22: ...arm Message 2 Running message 3 Version 4 Daily Energy 5 Monthly Energy 6 Yearly Energy 7 Daily Records 8 Communication Data 9 Warning Message The following submenus are displayed when the Settings me...

Страница 23: ...history of changing settings Only for maintance personel 7 Normal operation 7 Normal operation 7 4 3 Version The screen shows the model version of the inverter And the screen will show the software v...

Страница 24: ...99 Figure 7 16 Selecting the User Def menu will access to the following submenu see Figure 7 17 Figure 7 17 OV G V1 400V OV G V1 T 1 0S Below is the setting range for User Def Using this function the...

Страница 25: ...alue of total energy Use this function could allow user to revise the value of total energy to the same value as before If the monitoring website is used the data will be synchronous with this setting...

Страница 26: ...not connected or logic interface relay is opened the inverter will display LimbyDRM and the inverter output power will be limited to zero 1 Select Initial Settings 2 Select DRM and set it to ON 7 5 10...

Страница 27: ...ere are 4 settings in this menu as below 1 OFF 2 Meter in Load 3 Meter in Grid 4 Consumption Monitor OFF Functions are disabled Meter in Load Canadian Solar Smart Meter is connected in the load branch...

Страница 28: ...als to one of three phase load power that is the lowest load power of a certain phase Figure 7 31 Inverter Meter 7 5 13 Restart HMI The function is used for restart the HMI This function is applicable...

Страница 29: ...Test Figure 7 33 Selecting Fan Test displays the sub menu shown below Are you sure YES ENT NO ESC Fan Test is a factory test function Press the ENTER key to start the test Press the ESC key to return...

Страница 30: ...t When operating the inverter LCD screen displays PID repairing information and the red light is on The Night Time PID Recovery function is always ON when AC is applied If maintenance is required and...

Страница 31: ...xed 2 Check if the DSP connector to power board are fixed 1 Check inverter surrounding ventilation 2 Check if there s sunshine direct on inverter in hot weather 1 Use user define function to adjust th...

Страница 32: ...ing current down below 0 5A Turn off the two DC switchs and fix the polarity issue Screen OFF with DC applied Inverter internally damaged 1 Do not turn off the DC switches as it will damage the invert...

Страница 33: ...CSI 50K T400GL03 E Max output current Amps 83 6 3 N PE 220 380 230 400 Rated grid output current Amps 10 Specifications AC connection DC connection Display Communication connections MC4 connector OT...

Страница 34: ...0 195 CSI 25K T220GL03 E Max output current Amps 72 2 3 N PE 220 Rated grid output current Amps AC connection DC connection Display Communication connections MC4 connector OT Terminal max 70 mm LCD Ca...

Страница 35: ...ances and are properly ventilated Completed 5 Serial number Record the product serial numbers located on the side label Serial Numbers attached list 6 Solar modules Confirm PV module installation comp...

Страница 36: ...0GL01 E CSI 8K T400GL01 E CSI 10K T400GL01 E 1 Switch the grid supply main Switch AC ON first 2 Switch the DC switch ON If the voltages of PV arrays are higher than start up voltage the inverter will...

Страница 37: ...e front panel interface Completed Record current date time in Notes 6 Communication setting if avail Set communication with a unique address for each inverter Completed Record address in Notes 7 Machi...

Страница 38: ...Output power Input DC voltage Insulation limit K PV start up voltage Grid V Max V Min Frequency Max Min Reactive compensation PF Configuration MPPT Individual MPPT Parallel Monitoring RS485 Ethernet...

Страница 39: ...r to inverter site selection and installation 3 PHASE STRING INVERTERS CSIF ST 016 A 0 INSTALLER S NAME INSTALLER S SIGNATURE COMPANY DATE Inverter serial numbers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1...

Отзывы: