should be multiplied by 1.25, and a correction factor should 

be  applied  to  the  open-circuit  voltage  (see  Table  1  below), 

when determining component ratings and capacities. 

Table 1: Low temperature correction factors for open-

circuit voltage 

Lowest Expected 

Ambient Temperature 

(°C/°F) 

Correction Factor 

24 to 20 / 76 to 68

 

1.02 

19 to 15 / 67 to 59

 

1.04 

14 to 10 / 58 to 50

 

1.06 

9 to 5 / 49 to 41

 

1.08 

4 to 0 / 40 to 32

 

1.10 

-1 to -5 / 31 to 23

 

1.12 

-6 to -10 / 22 to 14

 

1.14 

-11 to -15 / 13 to 5

 

1.16 

-16 to -20 / 4 to -4

 

1.18 

-21 to -25 / -5 to -13

 

1.20 

-26 to -30 / -14 to -22

 

1.21 

-31 to -35 / -23 to -31

 

1.23 

-36 to -40 / -32 to -40

 

1.25 

Alternatively, a more accurate correction factor for the open-

circuit voltage can be calculated using the following formula: 

𝐂

Voc

= 𝟏 −   𝜶

𝑽𝒐𝒄

  × (𝟐𝟓 − 𝐓)

 

T  (°C)  is  the  lowest  expected  ambient  temperature  at  the 

system installation site. 

α

Voc

  (%/°C)  is  the  voltage  temperature  coefficient  of  the 

selected module (refer to corresponding datasheet). 

OCPD  rating  selection  should  be  done  per  the  following 

guidance,  where  the  minimum  OCPD  rating  possible  is 

determined  by  calculating  the  expected  maximum  circuit 

current for the PV system, and the maximum OCPD rating 

constrained by the IEC 61215: 2016 and UL 61730 standard 

requirements for the certified PV modules. 

Minimum  string  fuse  rating  <  X  ≤  Maximum  string  fuse 

rating. 

The maximum string fuse ratings can be found in datasheets 

and nameplates for all the certified Canadian Solar module 

types. 

The  minimum  string  fuse  rating  for  compliance  with  NEC: 

2017 code and IEC 62548: 2016 requirement is suggested 

to be determined as follows: 

Minimum string fuse rating = Isc

STC

 x 1.25 x Max (1.175, 

Impp

α

 ÷ Impp

STC

). 

Impp

α 

= the highest 3-hour current average resulting from 

the simulated local simultaneous irradiances on the front 

and rear sides of the PV array accounting for elevation and 

orientation. 

Isc

STC

 = the listed short circuit current at 0% bifacial gain 

on the PV module datasheet or nameplate label. 

Impp

STC

 = the listed MPP operating current at 0% bifacial 

gain on the PV module datasheet or nameplate label. 

An assembly, together with its overcurrent device(s), that is 

listed  for  continuous  operation  at  100  percent  of  its  rating 

shall be permitted to be used at 100 percent of its rating, and 

therefore shall not require the additional 1.25 multiplier. 

Electrical  calculations  and  design  must  be  performed  by  a 

competent engineer or consultant. 

Please contact Canadian Solar’s technical support team for 

additional information pertaining to engineering optimization 

and approval of project specific module string lengths. 

4 UNPACKING AND STORAGE 

 

PRECAUTIONS 

 

Modules  should  be  stored  in  a  dry  and  ventilated 

environment  to  avoid  direct  sunlight  and  moisture.  If 

modules  are  stored  in  an  uncontrolled  environment,  the 

storage  time  should  be  less  than  3  months  and  extra 

precautions  should  be  taken  to  prevent  connectors  from 

being exposed to moisture or sunlight, like using connector 

endcaps.  Protect  the  package  from  damage.  In  any 

circumstances,  pallets  with  landscape-oriented  module 

packaging  shall  not  be  stacked  vertically  more  than  two 

high;  and  for  pallets  with  portrait-oriented  module 

packaging, stacking is not allowed. 

When  unloading  module  pallets  from  a 

flatbed truck, please use a crane or a forklift 

to  remove  the  module  pallets.  When 

unloading  module  pallets  from  containers,  please  use  a 

forklift  to  remove  the  module  pallets  from  the  container  or 

trailer. Do not move any pallets within the container or trailer 

Содержание CS6R-MS Series

Страница 1: ...For professional use only INSTALLATION MANUAL OF PHOTOVOLTAIC MODULE...

Страница 2: ...NPACKING AND STORAGE 5 5 MODULE INSTALLATION 7 5 1 MODULE WIRING 9 5 2 GROUNDING 12 6 MOUNTING INSTRUCTIONS 13 6 1 MOUNTING METHOD BOLTING 14 6 2 MOUNTING METHOD CLAMPING 16 6 3 INSERTION SYSTEM 23 6...

Страница 3: ...nguage versions of this document the English version shall prevail Please refer to our product lists and documents published on our website at www csisolar com as these lists are updated on a regular...

Страница 4: ...C No 793 93 and Commission Regulation EC No 1488 94 as well as Council Directive 76 769 EEC and Commission Directives 91 155 EEC 93 67 EEC 93 105 EC and 2000 21 EC the REACH Regulation we inform you t...

Страница 5: ...x 1 25 x Max 1 175 Impp ImppSTC Impp the highest 3 hour current average resulting from the simulated local simultaneous irradiances on the front and rear sides of the PV array accounting for elevation...

Страница 6: ...anti tipping structure Such structure can be built with the pallet s own wooden frame or with the spare parts provided in the pallets During unpacking the unpacked modules should be properly fixed Aft...

Страница 7: ...ation Class A equivalent to Safety Class II requirements Modules rated under this class should be used in systems operating at voltage above 50V or power above 240W where general contact access is ant...

Страница 8: ...general technical system requirements Ensure that other systems components do not damage the module mechanically or electrically Modules can be wired in series to increase voltage or in parallel to in...

Страница 9: ...A module can be considered to be unshaded if its entire surface is free from shading all year round including on the shortest day of the year For optimizing the power generation of the rear side of b...

Страница 10: ...dian Solar sales representative Cables should always be fastened on module frames or mounting rails in order to avoid shading on the rear side of bifacial modules In case where a cable connection meth...

Страница 11: ...g connector endcaps should be taken to avoid moisture and dust penetrating into the connector If end caps are present on un mated connectors carefully remove by hand the end caps before connecting the...

Страница 12: ...structions presented below and the requirements of the National Electrical Code Any grounding means used with Canadian Solar modules should be NRTL certified to UL 467 and UL 2703 standards Please con...

Страница 13: ...standing equal or greater mechanical loads The mounting system supplier is responsible for the strength and stability of the mounting structure which must meet the requirements of the relevant design...

Страница 14: ...ill lead to more severe deflection 6 1 MOUNTING METHOD BOLTING The mechanical load test with these mounting methods were performed according to IEC 61215 Modules should be bolted to supporting structu...

Страница 15: ...3200Pa 5400Pa 3200Pa CS6W MS CS7L MS CS7N MS 5400Pa 2400Pa CS6W T Preliminary 5400Pa 2400Pa CS6R T Preliminary 5400Pa 2400Pa 5400Pa 2400Pa CS6R H AG CS6RA H AG 5400Pa 2400Pa 3600Pa 2400Pa CS6W MB AG...

Страница 16: ...When installing inter modules or end type clamps please take the following measures into account 1 Do not bend the module frame 2 Do not touch or cast shadows on the front glass 3 Do not damage the su...

Страница 17: ...0 100 100 600 250 550 400 500 CS6W MS CS7L MS 300 600 400 500 CS7N MS 300 600 450 550 CS6W T Preliminary 400 500 CS6R T Preliminary 300 400 CS6L MS Preliminary 400 500 CS6R H AG 400 550 400 500 CS6RA...

Страница 18: ...long side frame Module Types Max Mechanical Load Pa 1600 1600 2800 2400 3200 2400 3600 2400 4000 2400 4000 3200 5400 2400 A1 Range mm CS6R MS CS6RB MS 200 600 200 300 CS6RA MS 200 400 CS6R MS HL 100 6...

Страница 19: ...de of frame and rails perpendicular to the long side frame Module Types Max Mechanical Load Pa 5400 2400 5400 2800 6000 3600 6000 4000 8100 5000 A3 A5 Range mm CS6R MS CS6RA MS CS6RB MS 80 380 CS6R MS...

Страница 20: ...0 100 300 CS6R H AG 400 600 200 250 CS6W MB AG F42 Frames 600 700 200 250 with 35mm height frame 6 2 7 Four clamps mounting on short side of frame Module Types Max Mechanical Load Pa 1200 1200 2200 22...

Страница 21: ...r single glass monofacial modules Note that clamp overlap length of 40mm or 1 50 in when uplift load 2400 Pa is allowed Landscape installation clamping on long side frame Modyle Type Max Span Max Cant...

Страница 22: ...Solar Co Ltd www csisolar com Modyle Type Max Span Max Cantilever length Downforce Uplift CS6R MS HL 48 inches 1 22 m 16 inches 0 41 m 1800 Pa 1800 Pa 32 inches 0 81 m 10 7 inches 0 27 m 1800 Pa 1800...

Страница 23: ...ule frame 2 Do not touch the front glass or cast shadows onto it 3 Do not damage the surface of the frame 4 Ensure that the insertion profiles overlap the module frame by at least 10 mm 0 39 in 5 Ensu...

Страница 24: ...le clamps to the mounting rails using the torque stated by the mounting hardware manufacturer M6 X 1 1 4 or M8 X 1 25 5 16 bolt and nut are used for this bolting method The tightening torques should b...

Страница 25: ...6 1900 1900 B1 B2 B3 B4 16 2600 2200 CS6W TB AG A1 A3 400 B1 B3 790 B1 B2 A3 A4 16 1900 1900 B1 B2 B3 B4 16 2600 2200 CS6W MB AG F42 Frame A1 A3 400 B1 B3 790 B1 B2 A3 A4 16 1800 1600 B1 B2 B3 B4 16 2...

Страница 26: ...the potential electric shock hazard Cracked or broken modules represent an electric shock hazard due to leakage currents and the risk of shock is increased when modules are wet Before cleaning thoroug...

Страница 27: ...n Solar technical support department for information on the use of cleaning solutions and loading specifications OPERATION PREPARATION Noticeable dirt must be rubbed away by gentle cleaning implement...

Страница 28: ...to roof array size array spacing and anti nesting features as it may allow a more efficient ventilation The graphics below from IEC 63126 show this influence the maps presented here are a general guid...

Страница 29: ...29 EN Rev IM GN EN 1 0 Copyright January 2023 CSI Solar Co Ltd www csisolar com Figure A 3 Spatial distribution of the K ppen climate types for the period from 1901 to 2010...

Страница 30: ...electrical parameters and limitations of the MLPE devices and the Canadian Solar modules are suitable for one another Failure to comply with these instructions will void the Canadian Solar warranty I...

Страница 31: ...their distance from the coastline Different coastal land areas are defined according to how far away from the coastline they are Canadian Solar generally classifies seashore PV installations according...

Страница 32: ...n These washers are made in a process called explosion welding Concerning insulation gaskets we recommend mica laminate or other silicone or fluoride based insulating materials C 2 3 ANTI CORROSION ME...

Страница 33: ...eas Process specifications for the different components must comply with relevant international anti corrosion standards Minimum coating thicknesses for hot dip galvanized and anodizing oxide componen...

Страница 34: ...CSI Solar Co Ltd www csisolar com of any kind including but not limited to bodily harm injury and damage to property as a result of handling modules installing systems or compliance or non compliance...

Страница 35: ...Copyright January 2023 CSI Solar Co Ltd www csisolar com AMENDED EDITIONS AND DATES Rev 1 0 integrated version first release in January 2023 CSI Solar Co Ltd 199 Lushan Road SND Suzhou Jiangsu China...

Отзывы: