
Harvia M3 Wood Stove Installation (Chimney out the top) (Optional)
Place the first thick insulated chimney pipe on top of
the first pipe and put it through the hole in the roof.
On the top of the sauna, pull the boot over the pipe,
mark the outline of the boot.
tel: 888-923-9813 | [email protected]| web: www.leisurecraft.com
Manufactured by:
Lift the boot out of the way and apply the included
roof sealer on the inside of the outline.
Pull the boot back down and secure with the included
self sealing roofing screws 2-
3” (51mm to (76mm) )
apart.
23
Harmony Barrel Sauna
Assembly Instructions