background image

EN-Rev IM-FDM-EU/1.7 Copyright © April 2019. Canadian Solar Inc.

10 | 

·  The module is only considered to comply with 

IEC 61215 and UL 1703 when mounted as speci-
fied in the instructions in ANNEX B. Any module 
without a frame (laminate) shall not be conside-
red to comply with the requirements of UL 1703 
unless the module is mounted with hardware 
that has been tested and evaluated with the mo-
dule under this standard or by a field Inspection 
certifying that the installed module complies 
with the requirements of UL 1703.

·  Double glass modules can be mounted to a 

support structure by means of clamps. For 
recommended installation methods and load, 
please refer to ANNEX B and contact your local 
representative for further information. Failure 
to use a recognized installation method will void 
Canadian Solar Inc. warranty.

7.0 

MAINTENANCE

·  Do not make modifications to any component 

of the PV module (diode, junction box, plug 
connectors or others).

·  Regular maintenance is required to keep 

modules clear of snow, bird droppings, seeds, 
pollen, leaves, branches, dirt spots, and dust.  

·  Modules with sufficient tilt (at least 15°), 

generally do not require cleaning (rain will have 
a self-cleaning effect). If the module has become 
soiled, it shall be washed with water and a non-
abrasive cleaning brush or sponge during the 
cool part of the day. Do not scrape or rub dry dirt 
away, as this may cause micro scratches.

·  Snow should be removed using a soft brush.

·  Periodically inspect the system to check the 

integrity of all wiring and supports.

·  To protect against electric shock or injury, 

electrical or mechanical inspections and 
maintenance should be performed by qualified 
personnel only.

·  Please refer to our Installation Manual Annex  

of standard solar modules (Section Annex 
D: Module Cleaning Guideline) for more 
information on this topic.

AMENDED EDITIONS

AND DATES

· Rev 1.7 is released in April 2019.

Содержание CS3U-MS-FG

Страница 1: ...INSTALLATION MANUAL OF DYMOND MODULE For professional use only...

Страница 2: ...ICAL ELECTRICAL SPECIFICATIONS 4 0 UNPACKING AND STORAGE 5 0 MODULE INSTALLATION 5 1 MODULE WIRING 5 2 MODULE GROUNDING 6 0 MOUNTING INSTRUCTIONS 7 0 MAINTENANCE AMENDED EDITIONS AND DATES ANNEX A MEC...

Страница 3: ...c shall not be held responsible for damages of any kind including without limitation bodily harm injury or damage to property in connection with handling PV modules system installation or compliance o...

Страница 4: ...stance of Very High Concern SVHC in a concentration above 0 1 weight by weight The coating of the ribbon of our solar modules contains lead CAS no 7439 92 1 Under normal or reasonably foreseeable cond...

Страница 5: ...es under any circumstances Localized heavy loads may cause severe micro cracks at cell level which in turn may compromise module reliability and void Canadian Solar Inc s warranty Do not drop or place...

Страница 6: ...ng system supplier ENVIRONMENTAL CONDITIONS The module is intended for use in general open air climates as defined in IEC 60721 2 1 Classification of environmental conditions Part 2 1 Environmental co...

Страница 7: ...ar Permanent shading conditions can affect module service lifetime due to accelerated ageing of the encapsulation material and thermal stress on the bypass diodes RELIABLE VENTILATION Sufficient clear...

Страница 8: ...n North America and single conductor cable 2 5 16 mm 5 14 AWG 90 C wet rated in other areas i e TUV 2PfG1169 or EN50618 approved with proper insulation which is able to withstand the maximum possible...

Страница 9: ...ng torques should respectively be within 17 23 Nm 12 5 17 0 ft lb for M8x1 25 Grade 8 8 5 16 18 Grade B7 galvanized or A2 70 stainless steel coarse thread bolts depending on bolt class The yield stren...

Страница 10: ...not make modifications to any component of the PV module diode junction box plug connectors or others Regular maintenance is required to keep modules clear of snow bird droppings seeds pollen leaves b...

Страница 11: ...G 395 40 6 9 73 48 4 10 25 CS3U 400MS FG 400 40 8 9 81 48 6 10 33 CS3U 405MS FG 405 41 9 88 48 8 10 41 CS3U 410MS FG 410 41 2 9 96 49 10 49 CS3U 310P FG 310 37 2 8 34 44 7 8 88 30 2000 x 992 x 5 8 78...

Страница 12: ...33 5 9 56 40 1 9 97 CS3K 325P FG 325 33 7 9 65 40 3 10 05 CS6K 245P FG 245 30 0 8 17 37 1 8 74 15 1658 992 5 8 65 3 39 1 0 23 in without junction box and corner protector 23 50 7 lbs CS6K 250P FG 250...

Страница 13: ...77 5 39 1 0 23 in without junction box and corner protector 27 5 60 6 lbs CS6X 295P FG 295 36 0 8 19 44 5 8 76 CS6X 300P FG 300 36 1 8 30 44 6 8 87 CS6X 305P FG 305 36 3 8 41 44 8 8 97 CS6X 310P FG 3...

Страница 14: ...n and local climate Determination of the design loads is the responsibility of the racking suppliers and or professional engineers For detailed information please follow local structural code or conta...

Страница 15: ...mp length 100 mm four clamps A 380 20 mm see illustration A Downforce load 2400 Pa Uplift load 2400 Pa VDE CSA 2 C 2 Profi clamp wide 3 8 mm clamp length 200 mm four clamps A 380 20 mm see illustratio...

Страница 16: ...ngth 100 mm six clamps A 250 20 mm B 579 20 smm see illustration B Downforce load 5400 Pa Uplift load 2400 Pa VDE CSA 2 F 1 Akcome Metals Technology Suzhou Co Ltd AK EC DG End clamp AK MC DG Middle cl...

Страница 17: ...i clamp wide 3 8 mm clamp length 130 mm four clamps A 440 20 mm see illustration A Downforce load 2400 Pa Uplift load 2400 Pa VDE CSA 3 C 2 Profi clamp wide 3 8 mm clamp length 250 mm four clamps A 44...

Страница 18: ...mm B 684 20 mm see illustration B Downforce load 5400 Pa Uplift load 2400 Pa VDE CSA 3 F 1 Akcome Metals Technology Suzhou Co Ltd AK EC DG End clamp AK MC DG Middle clamp clamp length 130 mm four clam...

Страница 19: ...400 Pa VDE CSA 4 C 1 Xiamen Grace SolarTechnology co ltd GS IC Middle clamp GS EC End clamp clamp length 200 mm four clamps A 380 20 mm see illustration A Downforce load 5400 Pa Uplift load 2400 Pa VD...

Страница 20: ...tter GmbH Profi clamp wide 3 8 mm clamp length 250 mm four clamps A 440 20 mm see illustration A Downforce load 5400 Pa Uplift load 2400 Pa VDE CSA 5 C 1 Xiamen Grace SolarTechnology co ltd GS IC Midd...

Отзывы: