![Can Industrial 407021P Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/can-industrial/407021p/407021p_assembly-manual_490953007.webp)
B---FRAME INSTALLATION
Figure 4
Figure 5
1.Figure 4 shows to connect the Top roof tube(No.1A),Roof curing tube(No.2A),
Roof curving tube at both doors
(No.3A) , Sidewall tube (No.4) and Standing leg(No.5) with Bolt M12x30mm(No.23), then put the arch into tube of
the Base flange by hoist, and assemble every group arch by turns(see Figure 5).
Figure 6
Figure 7
3. Connect Purlin(No.6) to arch by using Bolt M10x80mm (No.24) by turns(see Figure 7),then connect the Steel
wire(NO.17 and NO.19) on top and side by using Clip(No.18) (see Figure 7).