Can Industrial 407021P Скачать руководство пользователя страница 4

13

Lower Upright for Front & Back Door at Left

2 pcs

13A

Lower Upright for Front & Back Door at Right

2 pcs

14

Upper Door Track for Front & Back Door

4 pcs

15

Horizontal Tube for Front & Back Wall

8 pcs

16

Tube for Assembly the Winch

2 pcs

17

Surpporting Steel Wire for Side Wall

14 pcs

18

Clips

88 pcs

19

Steel Wire for Roof Frame

16 pcs

19A

Vertical Steel Wire for Arches

6 set

20

Lower Tensioning Tube for Front & Back Wall

8 pcs

21

Stake pegs

80 pcs

22

Tensioning Tube

2 groups

23 13*30 Bolts for tubes and two doors

160 set

24 10*80 Carriage Bolts

80 set

24A 10*90 Bolts for two doors

52 set

24B 10*60 Screw

6 set

24C 8*70 Screw

16 set

25

Tube should be insert into the Door Cover

14 groups

26

Winch for Door

2 set

27 dia.32mm Plastic Plugs

20 pcs

28

Rope

1 bundle

29

Wrench

2 pcs

30

Belts

16 pcs

31 Pvc Tube

2 groups

32 10*30 Screw

4 set

33

Small Rachet with Belts

10 pcs

34

Roof Cover

1 pcs

35

Front & Back Cover

2 pcs

Содержание 407021P

Страница 1: ...SHELTER ASSEMBLY MANUAL Model 407021P W40H21P SERIES Size W12 2mxH6 4m xL21 35m...

Страница 2: ...UCTIONS BEFORE ASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery places in high winds or wet location 2 Keep children away All children should...

Страница 3: ...for Side Wall Bent Tube 12 pcs 7 Base Plates for Uprights 12 pcs 7A Base Plate for left corner 2 pcs 7B Base Plate for right corner 2 pcs 7C Rachet with screw 20 set 8 Middle Base Plate for the Front...

Страница 4: ...r Arches 6 set 20 Lower Tensioning Tube for Front Back Wall 8 pcs 21 Stake pegs 80 pcs 22 Tensioning Tube 2 groups 23 13 30 Bolts for tubes and two doors 160 set 24 10 80 Carriage Bolts 80 set 24A 10...

Страница 5: ...Figure 1 Sketch of trussed frame shelter Size W12 2mxH6 4mxL21 35m...

Страница 6: ...es on the base palates Referring to the above diagram and confirm the place of base plates There are four holes on the plates for stake pegs Foundation placement As Figure 2 shows each Base plate is e...

Страница 7: ...l tube No 4 and Standing leg No 5 with Bolt M12x30mm No 23 then put the arch into tube of the Base flange by hoist and assemble every group arch by turns see Figure 5 Figure 6 Figure 7 3 Connect Purli...

Страница 8: ...C INSTALLING FRONT AND BACK COVER After Assembly the Arches pls assembly the front and back wall as the picture above show...

Страница 9: ...r Figure 9 Front door 2 Insert the tubes Part No 25 into front and back door through the pockets on covers tidy the front door and back door covers by using Rope No 28 make the cover well fold to the...

Страница 10: ...D INSTALLING THE ROOF COVER NOTE Do not install the cover onto the frame of your building in high wind conditions Figure 10...

Страница 11: ...each base plate alone one side Bands do not attach to tension tubes but loop around and secure at both ends on ratchet 3 The roof cover is tension ed frond front to back by the rope lacing to grommet...