
4
distance from the site construction (switching power to equipment distance) does not exceed
20m.
If 1.5mm national standard cable is used, 12V switching power supply is used, and the wiring
distance from the site construction (switching power to equipment distance) does not exceed
30m.
If 2.0mm national standard wire is used, 12V switching power supply is used, and the wiring
distance (switching power to the equipment distance) is not more than 40m.
2.1 Wiring instructions
The wiring instructions are shown in the table below.
Wire Description Function
Wire
sequence
Name
Description
A DC IN
POWER
1
12VDC in
12V power supply, 2A
2
GND
Ground
B Type-A USB USB Host
1
5V
Only used for factory testing.Do
Not connect it.
2
DN
3
DP
4
GND
C RJ45
Ethernet
1
Ethernet
Standard 100 megabit network
port, connect to PC for
configuration.
D OUT-4pin
lock control
signal
1
PUSH_OUT
Switching Level Output
2
LOCK_NONC_12V 12V switching drive output
3
GND
Ground
Содержание Hero-BK-PM
Страница 1: ...1 CAN AM Linux Access Control with AI Thermal detector User Manual Model Hero BK PM...
Страница 10: ...10 Delete account Select it first then Click Delete Account...
Страница 32: ...32 7 How to customize ARFaceManger tool s Logo Prepare 120 40 PNG Logo picture replace the one in Res folder...