45
5) The control will proceed into a Lockout 2 condition
6) Press
[Verify]
>
[Begin]
>
[Yes]
7) Press the reset button on the ignition control within the alotted time
Master Boiler
8) Press
and
9) Press
[Lead Lag Master Configuration]
10) Press
[Advanced Settings >]
11) Press the to arrive at
Outdoor Reset
12) Select
Enable: Enabled
13) Select
Maximum outdoor temperature
(WWSD)
14) Select
Minimum outdoor temperature
(Outdoor design)
15) Select
Low Water Temperature
(Min. water temp)
16) Select
Outdoor boost maximum off point
(Design max.)
17) Press
[Show Line]
to confirm reset curve
18) Press the to arrive at
Warm Weather Shutdown
19) Select
Enable = Shutdown after demand ends
Rotation Schedule Adjustment
Description
Electrical Connection(s)
Programming Instructions
•
Standard rotation
schedule is based on
equalizing run time on
a 1-hour schedule
•
To vary the rotation to a
fixed schedule based
on (hours, days)
1) Press
and
2) Press
[Lead Lag Master Configuration]
3) Press
[Advanced Settings >]
4) Press the to arrive at
Algorithms
5) Select
Lead selection method: Sequence order
6) Select
Lag selection method: Sequence order
7) Select
Lead rotation time: (user defined)
Содержание Avenger Series
Страница 2: ......
Страница 35: ...30 Figure 21 Recommended Piping with Reverse Return and Variable Primary Flow...
Страница 80: ...75 PART 12 EXPLODED VIEW Note Some items may not be as shown AVENGER PARTS LIST Figure A JACKET ASSMEBLY...
Страница 84: ...79 Figure B BLOWER BURNER ASSEMBLY...
Страница 87: ...82 Figure C TYPICAL GAS TRAIN AR1000 AR3000 Figure D TYPICAL GAS TRAIN AR3500 AR4000...
Страница 89: ...84 Figure E CONTROL BOARD ASSEMBLY...
Страница 92: ...87 PART 13 ELECTRICAL DIAGRAMS...
Страница 93: ...88...
Страница 94: ...89...
Страница 95: ...90...
Страница 96: ...91...
Страница 97: ...92...
Страница 98: ...93...
Страница 99: ...94...
Страница 100: ...95...
Страница 101: ...96...
Страница 102: ...97...
Страница 103: ...98...
Страница 104: ...99...
Страница 105: ...100...
Страница 106: ...101...