SECTION 2. TOWER INSTALLATION
2-2
120
29.5 '
17 '
RADIUS
TILT DIRECTION
(NORTH)
CENTER POINT
ANCHOR LOCATIONS
(3) PLCS
29.5 '
FIGURE 2.1-2. Top View of Base and Guy Anchor Layout
SIDE VIEW
TOP VIEW
ANCHOR BOLT
CEMENT
FOUNDATION
48"
36"
36"
North
FIGURE 2.1-3. Foundation for B18 Base
B18 Base
(3) places
Cement
Foundation
Содержание UT30
Страница 1: ...UT30 WEATHER STATION INSTALLATION MANUAL REVISED 4 98 COPYRIGHT c 1993 1998 CAMPBELL SCIENTIFIC INC ...
Страница 27: ...SECTION 3 INSTRUMENTATION INTALLATION 3 8 FIGURE 3 3 5 SRM 5A Wiring Computer Datalogger ...
Страница 32: ...SECTION 3 INSTRUMENTATION INSTALLATION 3 13 FIGURE 3 3 9 MD9 Multidrop Interface at the Computer ...