FIGURE 7-14. UTDK duckbill guy anchor being driven into the ground
2. Attach a high-lift jack to the loop and jack the anchor up about 6 inches to rotate the
anchor into the load-lock position (
(p. 23)).
WARNING:
Failure to install and lock the anchor at the correct angle will result in the anchor cable
cutting through the soil until the angles equalize, causing slack in the guy wires.
FIGURE 7-15. UTDUK duckbill in load-lock position
UT20 and UT30 Universal Towers
23
Содержание UT20
Страница 1: ...Revision 03 2020 Copyright 1993 2020 Campbell Scientific Inc...
Страница 10: ...FIGURE 5 1 UT20 tower UT20 and UT30 Universal Towers 7...
Страница 38: ...FIGURE 7 28 Bracket selection UT20 and UT30 Universal Towers 35...
Страница 41: ...A B 14 7 Page 1 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 42: ...C 43 2 cm 17 in A UTBASE Page 2 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 43: ...C B UTBASE Page 3 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...