FIGURE 7-8. Template frame placement
7. Remove the screws that secure the template frame to the concrete form. Remove the top
nylon nut from each anchor bolt, then lift the template and template frame off the anchor
bolts. Remove the remaining nylon nuts from the anchor bolts.
8. Apply the anti-seize lubricant included with the anchor bolts to the threads on each anchor
bolt. Thread a clevis onto each anchor bolt until three threads of each anchor bolt are
visible inside each clevis. Angle the clevises in the same direction to allow the tower to tilt
away from the equator as shown in
(p. 18). Leg 1 will be one of the two legs
along the side aimed at the equator. This positioning allows a solar panel to be attached to
two tower legs while providing easy access to sensors at the top of the tower.
UT20 and UT30 Universal Towers
17
Содержание UT20
Страница 1: ...Revision 03 2020 Copyright 1993 2020 Campbell Scientific Inc...
Страница 10: ...FIGURE 5 1 UT20 tower UT20 and UT30 Universal Towers 7...
Страница 38: ...FIGURE 7 28 Bracket selection UT20 and UT30 Universal Towers 35...
Страница 41: ...A B 14 7 Page 1 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 42: ...C 43 2 cm 17 in A UTBASE Page 2 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 43: ...C B UTBASE Page 3 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...