background image

Model 109SS Temperature Probe 

9:  Z=X+F (P34) 
  1:  8 

  X Loc [ Tk        ] 

 2:  -273.15   F 
  3:  9 

  Z Loc [ Air_Temp  ] 

 
10:  If time is (P92) 
  1:  0 

  Minutes (Seconds --) into a 

  2:  10 

  Interval (same units as above) 

  3:  10 

  Set Output Flag High (Flag 0) 

 
11:  Real Time (P77) 
  1:  110 

  Day,Hour/Minute (midnight = 0000) 

 
12:  Average (P71) 
 1:  1 

 Reps 

  2:  9 

  Loc [ Air_Temp  ] 

 
*Table 2 Program 
 02: 0.0000   Execution 

Interval 

(seconds) 

 
*Table 3 Subroutines 
 
End Program 

 

5.3  Electrical Noisy Environments 

AC power lines, pumps, and motors, can be the source of electrical noise.  If 
the 109SS probe or datalogger is located in an electrically noisy environment, 
the 109SS probe should be measured with the 60 Hz or 50 Hz integration 
option as shown in the examples in Section 5.1.1.2 and Section 5.2.1.  The  
60 Hz and 50 Hz integration options are not available for the CR200(X). 

5.4  Long Lead Lengths 

Additional settling time may be required for lead lengths longer than 300 feet, 
where settling time is the delay before the measurement is made. 

For the CR800, CR850, CR1000, and CR3000, the 60 Hz and 50 Hz 
integration options include a 3 ms settling time; longer settling times can be 
entered into the Settling Time parameter.  The 60 Hz and 50 Hz integration 
options as well as the Settling Time parameter are not available for the 
CR200(X).  The example Therm109 instruction listed below has a 20 mSec 
(20000 

μ

Sec) delay: 

‘Therm109 ( Dest, Reps, SEChan, ExChan, SettlingTime, Integ, Mult, Offset ) 

Therm109(T109_C,1,1,1,20000,_60Hz,1.0,0.0) 

 

In Edlog, use the DC Half Bridge instruction (P4) with a 20 millisecond delay 
as shown below.  Use P4 in place of P5 in Section 5.2.1 (the instructions that 
follow P5 to convert the measurement result to temperature are still required). 

Содержание TEMPERATURE PROBE 109SS

Страница 1: ...Model 109SS Temperature Probe Revision 12 10 C o p y r i g h t 1 9 8 3 2 0 1 0 C a m p b e l l S c i e n t i f i c I n c...

Страница 2: ...International customers residing in countries served by Campbell Scientific Inc directly Affiliate companies handle repairs for customers within their territories Please visit www campbellsci com to...

Страница 3: ...am for CR200 X Series Datalogger 6 5 1 1 2 Example 2 Sample Program for CR1000 Datalogger 6 5 1 1 3 Sample Program for CR5000 7 5 2 Edlog 7 5 2 1 Example Edlog Program 7 5 3 Electrical Noisy Environme...

Страница 4: ......

Страница 5: ...fast time response This probe measures temperature from 40 to 70 C The thermistor can survive temperatures up to 100 C but the overmolded joint and cable should not be exposed to temperatures greater...

Страница 6: ...nformation Thermistor BetaTherm Micro BetaCHIP Probe 10K3MCD1 0 018 diameter 10Kohms at 25 C Probe stainless steel sheath 0 063 inch 0 16 cm diameter 2 3 inch 5 84 cm length overmolded joint 0 40 inch...

Страница 7: ...6 C over the range of 40 to 70 C and 0 49 C over the range of 20 C to 70 C The major error component is the interchangeability specification tolerance of the thermistor The bridge resistor has a 0 1 t...

Страница 8: ...d with one single ended input channel and a Voltage Excitation channel Multiple probes can be connected to the same excitation channel the number of probes per excitation channel is physically limited...

Страница 9: ...rm109 is used to measure temperature Therm109 provides excitation makes a single ended voltage measurement and calculates temperature The Therm109 instruction has the following form Therm109 Dest Repe...

Страница 10: ...0 EndTable BeginProg Scan 1 sec Measure the temperature Therm109 Air_Temp 1 1 Ex1 1 0 0 Call the data table CallTable AvgTemp NextScan EndProg 5 1 1 2 Example 2 Sample Program for CR1000 Datalogger C...

Страница 11: ...the resistance lnRt Log Rtherm Apply the Steinhart and Hart equation and convert to degrees C in one step Air_Temp 1 1 129241e 3 2 341077e 4 lnRt 8 775468e 8 lnRt 3 273 15 Call the data table CallTab...

Страница 12: ...c V_Vx 7 1 0 Mult 8 0 0 Offset 2 Z 1 X P42 1 1 X Loc V_Vx 2 2 Z Loc Vx_V 3 Z X F P34 1 2 X Loc Vx_V 2 1 F 3 3 Z Loc Vx_V_1 4 Z X F P37 1 3 X Loc Vx_V_1 2 24900 F 3 4 Z Loc Rtherm 5 Z LN X P40 1 4 X Lo...

Страница 13: ...integration options are not available for the CR200 X 5 4 Long Lead Lengths Additional settling time may be required for lead lengths longer than 300 feet where settling time is the delay before the m...

Страница 14: ...sary for general operation of the 109SS Probe with CSI s dataloggers The Therm109 Instruction outputs a 2500 mV excitation and measures the voltage across the 24 9 K resistor Figure 6 1 The thermistor...

Страница 15: ...on form and comply with the requirements specified in it Refer to the Warranty and Assistance page for more information 8 Troubleshooting Symptom Temperature is NAN INF 9999 273 Verify the red wire is...

Страница 16: ...stable Temperature Try using the 60 Hz or 50 Hz integration options and or increasing the settling time as described in Sections 8 and 9 Make sure the clear shield wire is connected to datalogger grou...

Страница 17: ......

Страница 18: ...p CSC 11564 149th Street NW Edmonton Alberta T5M 1W7 CANADA www campbellsci ca dataloggers campbellsci ca Campbell Scientific Centro Caribe S A CSCC 300 N Cementerio Edificio Breller Santo Domingo Her...

Отзывы: