manualshive.com logo in svg
background image

Safety

 

DANGER 

 MANY HAZARDS ARE ASSOCIATED WITH INSTALLING, USING, MAINTAINING, AND WORKING ON 

OR AROUND 

TRIPODS, TOWERS, AND ANY ATTACHMENTS TO TRIPODS AND TOWERS SUCH AS SENSORS, 

CROSSARMS, ENCLOSURES, ANTENNAS, ETC

.  FAILURE TO PROPERLY AND COMPLETELY ASSEMBLE, 

INSTALL, OPERATE, USE, AND MAINTAIN TRIPODS, TOWERS, AND ATTACHMENTS, AND FAILURE TO HEED 
WARNINGS, INCREASES THE RISK OF DEATH, ACCIDENT, SERIOUS INJURY, PROPERTY DAMAGE, AND 
PRODUCT FAILURE.  TAKE ALL REASONABLE PRECAUTIONS TO AVOID THESE HAZARDS.  CHECK WITH YOUR 
ORGANIZATION'S SAFETY COORDINATOR (OR POLICY) FOR PROCEDURES AND REQUIRED PROTECTIVE 
EQUIPMENT PRIOR TO PERFORMING ANY WORK. 

Use tripods, towers, and attachments to tripods and towers only for purposes for which they are designed.  Do not 
exceed design limits.  Be familiar and comply with all instructions provided in product manuals.  Manuals are 
available at www.campbellsci.eu or by telep44(0) 1509 828 888 (UK).  You are responsible for conformance 
with governing codes and regulations, including safety regulations, and the integrity and location of structures or land 
to which towers, tripods, and any attachments are attached.  Installation sites should be evaluated and approved by a 
qualified engineer.  If questions or concerns arise regarding installation, use, or maintenance of tripods, towers, 
attachments, or electrical connections, consult with a licensed and qualified engineer or electrician. 

General 

Prior to performing site or installation work, obtain required approvals and permits. Comply with all

governing structure-height regulations, such as those of the FAA in the USA.

Use only qualified personnel for installation, use, and maintenance of tripods and towers, and any

attachments to tripods and towers.  The use of licensed and qualified contractors is highly recommended.

Read all applicable instructions carefully and understand procedures thoroughly before beginning work.

Wear a hardhat and eye protection, and take other appropriate safety precautions while working on or

around tripods and towers.

Do not climb tripods or towers at any time, and prohibit climbing by other persons. Take reasonable

precautions to secure tripod and tower sites from trespassers.

Use only manufacturer recommended parts, materials, and tools.

Utility and Electrical 

You can be killed or sustain serious bodily injury if the tripod, tower, or attachments you are installing,

constructing, using, or maintaining, or a tool, stake, or anchor, come in contact with overhead or

underground utility lines.

Maintain a distance of at least one-and-one-half times structure height, or 20 feet, or the distance

required by applicable law, whichever is greater, between overhead utility lines and the structure (tripod,

tower, attachments, or tools).

Prior to performing site or installation work, inform all utility companies and have all underground utilities

marked.

Comply with all electrical codes.  Electrical equipment and related grounding devices should be installed

by a licensed and qualified electrician.

Elevated Work and Weather 

Exercise extreme caution when performing elevated work.

Use appropriate equipment and safety practices.

During installation and maintenance, keep tower and tripod sites clear of un-trained or non-essential

personnel.  Take precautions to prevent elevated tools and objects from dropping.

Do not perform any work in inclement weather, including wind, rain, snow, lightning, etc.

Maintenance 

Periodically (at least yearly) check for wear and damage, including corrosion, stress cracks, frayed cables,

loose cable clamps, cable tightness, etc. and take necessary corrective actions.

Periodically (at least yearly) check electrical ground connections.

WHILE EVERY ATTEMPT IS MADE TO EMBODY THE HIGHEST DEGREE OF SAFETY IN ALL CAMPBELL 
SCIENTIFIC PRODUCTS, THE CUSTOMER ASSUMES ALL RISK FROM ANY INJURY RESULTING FROM IMPROPER 
INSTALLATION, USE, OR MAINTENANCE OF TRIPODS, TOWERS, OR ATTACHMENTS TO TRIPODS AND TOWERS 
SUCH AS SENSORS, CROSSARMS, ENCLOSURES, ANTENNAS, ETC. 

Содержание SC105

Страница 1: ...SC105 CS I O to RS 232 Interface Revision 09 2022 Copyright 2004 2022 Campbell Scientific CSL I D 36...

Страница 2: ...under guarantee or not Please state the faults as clearly as possible and if the product is out of the guarantee period it should be accompanied by a purchase order Quotations for repairs can be give...

Страница 3: ...cell phones and aerials may also not be applicable according to your locality Some brackets shields and enclosure options including wiring are not sold as standard items in the European market in some...

Страница 4: ...beginning work Wear a hardhat and eye protection and take other appropriate safety precautions while working on or around tripods and towers Do not climb tripods or towers at any time and prohibit cl...

Страница 5: ...2 Specifications 2 3 Set up Menu 3 3 1 Set up Menu Selections 4 4 Installation 5 5 RAD Modem Application 5 5 1 RAD Modem Two Way 6 5 2 RAD Modem Wiring and Grounding 6 5 3 Testing RAD Modem Communicat...

Страница 6: ...SC105 is supplied from the 5 V supply on pin 1 of the data logger s CS I O port The SC105 will use the 5 V supply to power the RS 232 modem if needed Two way interactive communication Supports most R...

Страница 7: ...nection 7 Out RTS Request to Send Modem Enable 8 In CTS Clear to Send 9 In Ring Rings Data Logger CS I O 9 Pin Male Connector Pin out Pin No I O Name Description 1 In 5 V Regulated 5 Volt supply 2 GND...

Страница 8: ...ring communication mode CS I O port configuration RS 232 port configuration and other parameters The Set up Menu is shown in FIGURE 3 1 It is accessed by connecting the SC105 s RS 232 port to a PC wit...

Страница 9: ...CS I O Port Configuration An SC105 may be activated either by the Modem Enable signal or by a Synchronous Device SDC address 7 8 9 10 or 11 If PakBus Networking is being used SDC address 7 8 10 or 11...

Страница 10: ...installed to protect the computer and data logger in areas where damage due to lightning is possible If this is a RAD modem application see Section 5 2 RAD Modem Wiring and Grounding 5 RAD Modem Appl...

Страница 11: ...set the DCE DTE switch to DTE 2 Select a cable with two or more twisted pairs Direct burial rodent or gopher resistant cable is recommended 3 Wiring connections are made as shown in FIGURE 5 2 Note wi...

Страница 12: ...m powered by the SC105 RAD does sell a 9 volt power supply that will boost the signals enough to meet some of these more demanding applications Please contact RAD for more information 5 3 Testing RAD...

Страница 13: ...ter keyboard If the key pressed is not returned then the cable from the modem at the computer to the data logger modem is defective and will need to be repaired or replaced 3 If steps 1 and 2 pass the...

Страница 14: ...nfo campbellsci fr www campbellsci fr Germany Location Phone Email Website Bremen Germany 49 0 421 460974 0 info campbellsci de www campbellsci de India Location Phone Email Website New Delhi DL India...

Отзывы: