I
TABLE OF CONTENTS
PDF viewers note: These page numbers refer to the printed version of this document. Use
the Adobe Acrobat® bookmarks tab for links to specific sections.
PAGE
1.
PREPARATION AND SITING
.............................................................................................1-1
1.1
Installation Tasks
1.2
Tools Required
1.3
Siting and Exposure
1.4
Determining True North for Wind Vane Orientation
2.
ET TOWER INSTALLATION
...............................................................................................2-1
2.1
Base Installation
2.2
Tower Installation
2.3
Tower Grounding
3.
ET INSTRUMENTATION INSTALLATION
.....................................................................3-1
3.1
Enclosure, Datalogger, Power Supply
3.2
Sensor Connection
3.3
Communication and Data Storage Peripherals
3.4
Sealing and Desiccating the Enclosure
4.
ET101 REDUCED SENSOR SET INSTALLATION
.....................................................4-1
4.1
Reduced Sensor Set Installation Components
4.2
Installation
4.3
Sensor Connection
4.4
Pyranometer
4.5
Soil Temperature Sensor (Optional)
4.6
Verification and Clock Set
5.
ET SOFTWARE INSTALLATION
......................................................................................5-1
5.1
Quick Start Review
6.
MAINTENANCE AND TROUBLESHOOTING
...............................................................6-1
6.1
Maintenance
6.2
Troubleshooting
Содержание ET101
Страница 4: ...This is a blank page ...
Страница 12: ......
Страница 26: ......
Страница 30: ......
Страница 32: ......
Страница 36: ......
Страница 37: ...This is a blank page ...