background image

FT-29 Palazzo Obelisk Fountain 

Assembly Instructions

Step 9 -   Use another hose clamp to secure the 18" non-kink tubing to the pipe protruding from the 

bottom of the obelisk (FT-29A).

Step 10 -   Center the obelisk (FT-29A) over the column (FT-29B).

Step 11 -   Place the pump cover door (FT-29B/30CC) in the pump access opening of the pump 

cover (FT-29C/30D).

Step 12 -   Fill the basin with water.

FT-29A (175 lbs) 

11"L x 11"W x 38"H

FT-29B/30CC (4 lbs) 

5"L x 1"W x 5"H

Отзывы: