rev 4/8/2020
FT-304 Westover Fountain
Assembly Instructions
Step 8 - Center the small bowl (FT-304B) over the pump house (FT-304C).
Step 9 - Using a hose clamp to secure the loose end of the non-kink tubing to the pipe protruding
from the bottom of the small bowl (FT-304B).
FT-304B (15 lbs)
15.5"W x 4.25"H
Step 10 - Center the finial (FT-77A/78A) over the small bowl (FT-304B).
Step 11 - Fit the pipe protruding from the top of the small bowl (FT-304B) into the hole in the
bottom of the finial (FT-77A/78A).
FT-77A/78A (5 lbs)
5"W x 8.5"H
Step 12 - Fit the pump house door (FT-304CC) into the pump house (FT-304C).
Step 13 - Fill the fountain with water.
FT-304CC (2 lbs)
4.5"L x 1"W x 4.5"H