background image

FT-193 Caterina Fountain in Basin 

Assembly Instructions

Step 9 -   Position the large bowl (FT-192E) on top of the large pedestal (FT-193E).

Step 10 -   Fit the standpipe into the large bowl (FT-192E).

Step 11 -   Center the small pedestal (FT-193C) inside the large bowl (FT-192E).

Step 12 -   Using a hose clamp, connect the 1/2" non-kink tubing end of the assembled tubing to 

the pipe protruding from the bottom of the small bowl (FT-192B).

Step 13 -   Feed the tubing down through the small pedestal, large bowl, and large pedestal to the 

pump.

Step 14 -   Fit the 3/4" clear tubing over the pump outlet.

Step 15 -   Center the small bowl (FT-192B) on the small pedestal (FT-193C).

Step 16 -   Place the finial (FT-193A) into the small bowl (FT-192B) by fitting the copper in the finial 

over the copper in the bowl.

Step 17 -   Fit the pump cover door (FT-193G) into the pump cover (FT-193F).

FT-192E (162 lbs) 

35.25"W x 8"H

FT-193C (35 lbs) 

10"W x 16"H

FT-192B (34 lbs) 

18.25"W x 5"H

FT-193A (13 lbs) 

5.5"W x 13"H

FT-193G (6 lbs) 

7.5"L x 2.75"W x 5.5"H

Отзывы: