P
ag
e 7 - M
an
u
al
c
od
e:
11
9D
V1
1E
N
ve
rs
.
5
0
1/
2
0
15 © C
A
M
E S
.p.
A
.
The data and information provided in this manual are subject to change at any time without prior notice.
EN
⚠
Before installing the operator:
• Provide a suitable single-pole disconnection device, with a maximum of 3 mm between the contacts, to disconnect the
power supply;
• Prepare suitable piping and ducts for routing the electrical cables, ensuring protection against mechanical damage;
•
Make sure that any connections within the container (made to ensure the continuity of the protection circuit) are
fitted with additional insulation compared to the other internal conductor parts;
• Make sure the gate structure is sturdy enough, that the hinges are in proper working order and that there is no friction
between the moving and fixed parts;
• Make sure there are opening and closing mechanical stops.
Tools and materials
Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and com-
pliance with current standards and regulations. The figure shows some examples of installer’s tools.
System feasibility
Preliminary checks
⚠
Installation must be carried out by qualified and experienced personnel in compliance with applicable regulations.