background image

TITLE

7

 pre-installed

 sim card

The pre-installed SIM card is an IOT/M2M multi SIM complete with 480MB data allowance and 3 year life term. 
Under average usage of 3-4 gate manoeuvres per day, the data should last approximately 3 years.
In case you use up the 480MB data volume before the end of the 3-year term, you can easily add another 480MB data 
volume by making a top-up, details of which can be found here:

www.cameconnect.co.uk/gsmmodule

Due to situations outside of our control, CAME cannot guarantee signal strength or availability and therefore will not be 
held liable for lack of service.

came 

automation

internet

came 

cloud

setup app

for the installer

GET IT ON

App Store

GET IT ON

automation app

for the end user

GET IT ON

App Store

GET IT ON

System Frequency

Approx. Movements

Est. SIM Life Based on Usage

Occasional Usage

Approx. 5 gate manoeuvres per 

week

4-7 Years*

Average Usage**

Approx. 3-4 gate manoeuvres 

per day

3-4 Years

High Usage

Approx. 5+ gate manoeuvres per 

day, multiple scenarios running

1-3 Years

* SIM will expire after 3-4 years. (CAME guarantees 3 years with some tolerance for shelf life consideration)  

** We anticipate SIM provided will have suffi cient data for Average Usage (as shown above) lasting approx. 3 years   

8

 initial 

power ON

OUT1

OUT2

Keycode

123456789ABCDE F

MATR

54051 6

300mAE

GSM – 900  33dBm

DCS – 1800   30dBm

869.5MHz     14dBm  

24V

CONNECT

123

4

GND

A

N

T

10

+

2

COM

IN2

COM

IN1

B
A

 1A 30V

RGSM001S

1

2

1

     GSM LED (Blue)

    After a few seconds the LED will flash 1x/sec indicating the RGSM001S is registered on a GSM network.

2

     POWER LED (Green)

    The LED will flash 5x/sec indicating the RGSM001S is not yet configured on the Connect platform

Power on the control board.

The display will read 

 

26V

0V

17V

0

230V

26V

0V

17V

0

230V

M1 N1 E1

E2

M2

11

N2

+

-

E

+

-

E

10

TS

E

ES

1

2

3

3P

5

7

B GND

GND

S1

A

B1 B2

CX

2

CY CZ

4

FA1 FC1

FC2

FA2

L

N

WWW.CAME.COM

ZM3E

to check motor direction using

 control panel

CAUTION, Ensure the gate movement area is clear of all obstructions

Check the motor direction  

TEST MOT

  

Press and hold

 

 

=M2 

The gate should open, if not reverse the motor cables (Connections M2, N2) 
Leave the gate leaf in the halfway position.

Installer Tip 

 If the RGSM001S is located 

in a concealed area and a low 

GSM signal observed a 2m 

extension cable and bracket is 

available to purchase.

This then allows the aerial to 

be located in a more suitable 

position. Part No:

806SA-0050

Содержание FROGPLUS-S7

Страница 1: ...it for a single swing gate weighing up to 550kg max width 7m TO BE READ IN CONJUNCTION WITH THE FULL INSTRUCTION MANUAL QUICK SETUP GUIDE Typical gate setup geometry Gate motor manual release Kit wiri...

Страница 2: ...lease Device with Lever Key RGSM001S Gateway Module RSE Connection Card SIM May be preinstalled in RGSM001S 1 Kit Contents 2 Safety Instructions 3 Typical Gate Setup 4 Geometry 5 Manual Release Instru...

Страница 3: ...ssing through the gate Keep feet away from the bottom of the gate during operation Do not operate the gate by remote control unless they are in view Do not attempt to block or interfere with the gate...

Страница 4: ...rs one transmitter and one receiver They should be installed between 500 600mm from the ground facing each other Power for the photocells is taken from the control panel 24v AC The maximum range of th...

Страница 5: ...screw until it makes contact with the body tighten the nut to lock the position of the screw During closing close the leaves completely loosen the screw until it makes contact with the transmission ar...

Страница 6: ...5 Please note it may be necessay to operate the motor once power is restored to fully engage the system Please take care when operating the system in this manner The FROG PLUS underground system is su...

Страница 7: ...ble length RX 4 Core 0 5mm Flex TX 4 Core 0 5mm Flex 1m 30m 10 2 TX C NC TX 2 RX TX RGSM001S Gateway Module Cable length Max 3m power 10 2 A B GND Mains Supply 230 V AC Cable length 1m 20m 3 Core 1 5m...

Страница 8: ...ength or availability and therefore will not be held liable for lack of service came automation internet came cloud setup app for the installer GET IT ON AppStore GET IT ON automation app for the end...

Страница 9: ...ll read 6V V 7V 0 230V 26V 0V 17V 0 230V 1 E2 M2 11 N2 E E 10 TS E ES 1 2 3 3P 5 7 B GND GND S1 A B1 B2 CX 2 CY CZ 4 FA1 FC1 FC2 FA2 WWW CAME COM ZM3E to check motor direction using control panel CAUT...

Страница 10: ...rrive please check your junk folder download the connect setup app adding the rgsm gateway to your technician account technician connect setup app 1 3 2 If you have an existing account please move to...

Страница 11: ...Bm 24V CONNECT 123 4 GND A N T 10 2 COM IN2 COM IN1 B A 1A 30V RGSM001S If you intend to retain control of the SIM for top up If as the installer you intend to retain control of the SIM for top up pur...

Страница 12: ...tomation Select Manual Add Select FROG 230V ZM3E from the drop down list Enter a name and description then press Add adding automation 1 FROG 230V ZM3E Automation for swing gates Encoder Frog Plus M2...

Страница 13: ...ition or Add with QR Code If you pressed Local Acquisition the screen will change to the one shown here Select the button on the fob and it will add the button straight onto the control panel Set the...

Страница 14: ...cess for all fobs Select the back button to return to the main menu If you select ADD via QR Code the app will open the devices camera enabling scanning of the QR code on the fobs packaging Once the Q...

Страница 15: ...n App On first login you will be prompted to accept the gateway You will then be presented with control options for your automation To transfer to a customer select the 3 dots Select Transfer site Ent...

Страница 16: ...Connections X Y Leave the gate leaf in the halfway position 11 Setup the Encoder ENCODER Set Encoder Set Encoder Confirm yes The Gates will now perform a close and open cycle 12 Exit the programming...

Страница 17: ...d on the screen A maximum of 250 individual buttons can be saved Remove transmitter button 1 Press and hold the button for 2 seconds to access programming Language appears on the display 2 Users Remov...

Страница 18: ...n require activation from a command device to restart C1 REOPENING DURING CLOSING When the automation is in its closing cycle and the safety circuit is triggered the automation will stop and reverse i...

Страница 19: ...and fit the replacement SIM card into the slot Replace the casing and power up the control panel Send an SMS to the telephone number of the SIM reporting the APN details Access Point Name ask the serv...

Страница 20: ...colour 806SL 0240 SELB1SDG2 Surface mounted with blue backlighting for 50 users RAL7024 Grey colour 806SL 0250 SELB1SDG3 Surface mounted with blue backlighting for 250 users RAL7024 Grey colour TRANS...

Страница 21: ...to each other with no interference issues cross talk 001DIR10 Pair of 12 24 V AC DC outdoor photocells range 10m 001DIR20 Pair of 12 24 V AC DC outdoor photocells range 20m 001DIR30 Pair of 12 24 V AC...

Страница 22: ...correct use of the Software requires the possession of an automation home automation security temperature control and or video surveillance system manufactured by Came which has been enabled for remo...

Страница 23: ...ation of the automation home automation security temperature control and or video surveillance system manufactured by Came may be associated with the system itself In this way the installer can perfor...

Страница 24: ...immediate effect in the event of the violation of the terms of Articles 2 2 and or 2 5 In this case termination shall occur automatically upon receipt by the Installer of the notification sent by Came...

Страница 25: ...vidual parts of the additional network services and other related services referred to in Section 3 1 lit c of these GTC 1NCE expressly points out that the type and scope of such services of the respe...

Страница 26: ...tion 2 of these GTC for the Services Within the framework of the conclusion of the contract the Customer may choose between different payment methods offered by 1NCE Unless otherwise agreed between th...

Страница 27: ...a Protection Act Bundesdatenschutzgesetz 10 2The Parties also undertake to treat all other confidential information of the other Party that the receiving Party becomes aware of in connection with the...

Страница 28: ...O THIS DOCUMENT AT ANY TIME THE DATA AND INFORMATION SHOWN IN THIS CATALOGUE ARE SUBJECT TO CHANGE WITHOUT OBLIGATION TO GIVE PRIOR NOTICE BY CAME S P A E OE CAME BPT North Unit 1B Sills Road Willow F...

Отзывы: