Pa
g.
9
- M
an
ua
l c
od
e:
11
9A
V3
1
v
er
.
2.
0
0
9/
20
10 © C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. -
Th
e d
at
a a
nd i
nf
or
m
at
io
n r
ep
or
te
d i
n t
hi
s i
ns
ta
lla
tio
n m
an
ua
l a
re s
us
ce
pt
ib
le t
o c
ha
ng
e a
t a
ny t
im
e a
nd w
ith
ou
t o
bl
ig
at
io
n o
n C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. t
o n
ot
ify u
se
rs
.
5.5 Assembly diagram
Fig.3
2.64” in
2.6” in
6.
3”
in
4”
in
2.
4”
in
.1
2”
in
5.6 Installing the unit
- Check the efficiency of both moving and non-moving parts on the structure that will be supporting the operator.
- Determine, depending on the type of supporting structure and desired opening, the exact position of the motor assembly
by following the standard applications shown.
- Set up a closing end stop and an opening end stop (fig. 4, p. 5)
- Dig, depending on the size of the assembly, a foundation pit in the chosen spot (Fig. 3)
- Prepare a drainage system in the foundation, to drain away any water leaks which may cause oxidation (fig 3 – part.1)
- The foundation box makes for quick and easy setting up of the assembly. Place it inside the pit with the pin aligned to
the upper hinge (Fig. 3 – part. 2), sink it into the cement (Fig. 3 – part. 3) making sure it is perfectly levelled and that the
upper edge is 1 inch above ground level (Fig. 3 part. 4)
- Plan for the route of the electrical cables according to the command and safety instructions using the apposite hole on
the box (Fig. 3 – part. 5)
- Grease the rotation pins of the foundation box and the gate attachment lever; the hinge and pin lever must be aligned
- Position the gate leaf between the upper hinge and the pin lever; the hinge and pin lever must be aligned
- Secure the pin lever to the gate leaf, by welding spots from 1 to 1.5 inches apart along the contact surface.
Avoid any welding near the threaded screws (Fig. 3 – Part. 6).
Fig.2
- Screw the M10 x 100 (A) and the M10 (B) bolt onto the
gearmotor arm as shown in fig. 4-1 (left HAND installation)
and fig. 4-2 (right HAND installation)
- Affix the gearmotor to the foundation box using the threaded
pins and securing it using the provided bolts and washers
- Insert the (C ) transmission lever between the motor arm
and the box lever and electronically shut the gate against
the closing end stop. Adjust screw (A) until it touches the (C)
transmission lever.
- When testing, adjust the screw so as to allow proper closing
pressure of the gate leaf and allow its re-hooking during the
mechanism’s release procedure.
- Once adjustment is complete, secure the (B) nut.
Fig.4
RT
LF
Fig.4-1
Fig.4-2
A
B
C
C
B
A
LF
RT