Pa
g.
14
- M
an
ua
l c
od
e:
11
9A
V3
1
v
er
.
2.
0
0
9/
20
10 © C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. -
Th
e d
at
a a
nd i
nf
or
m
at
io
n r
ep
or
te
d i
n t
hi
s i
ns
ta
lla
tio
n m
an
ua
l a
re s
us
ce
pt
ib
le t
o c
ha
ng
e a
t a
ny t
im
e a
nd w
ith
ou
t o
bl
ig
at
io
n o
n C
AM
E c
an
ce
lli a
ut
om
at
ic
i s
.p
.a
. t
o n
ot
ify u
se
rs
.
8.3 Extraordinary maintenance
The following table serves to note down any extraordinary maintenance, repairs or improvements performed by
specialised firms.
Note: Any extraordinary maintenance must be performed by specialised technicians.
Extraordinary maintenance log
Date
Notes
Signature
Periodic maintenance log (for end-user) (every 6 months)
Installer’s stamp
Operator name
Date of job
Technician’s signature
Requester’s signature
Job
performed_____________________________________________________________________________________
________________________________________________________________________________________________
Installer’s stamp
Operator name
Date of job
Technician’s signature
Requester’s signature
Job
performed_____________________________________________________________________________________
________________________________________________________________________________________________
Installer’s stamp
Operator name
Date of job
Technician’s signature
Requester’s signature
Job
performed_____________________________________________________________________________________
________________________________________________________________________________________________