8
INSTALLATION: CSW-10AT-LFT METER
1)
The meter should be mounted where it is convenient for the operator. This
may be on the inside roof of the cab or on the dash.
Use the bracket provided with your system. Remove the knobs, place
bracket into position, insert screws to hold indicator bracket and tighten.
If mounting overhead, attach the indicator bracket using the 2 mounting
plates provided. Place the first plate on top of the roof, in position. Then
use the bolts provided to go through the indicator bracket and the second
plate. Mount this assembly through the cab roof and into the plate on top.
Install the lock washers and nuts.
2)
Attach the
CSW-10AT-LFT
Meter to the bracket by replacing the
knobs and tightening to meter. (one knob per side)
3)
Before installing the power cable be sure the power switch, on the rear
of the meter, is in the OFF position. Route the power cable from the
meter up and under the inside of the driver's cage and down the side
closest to the battery using the shortest route possible. Connect directly
to the battery. On electric trucks, attach power connection to the battery
disconnect or to the first terminal point. Position the power cable to
protect it from being cut or pinched then secure with wire ties provided.
4)
Install the signal cable by attaching the 9-pin male connector of the cable
to the CSW-10AT-LFT meter. The port is found on the rear of the meter
labeled
SIGNAL
.
5)
Secure the cable close to the meter with a wire tie to provide a strain relief.
Note: Take special care in routing the signal cable. Damage after
installation is a common problem.
6)
Lay the signal cable along the route you have chosen between the meter
and the scale section. The best route we have found to keep cuts to a
minimum is through the center of the mast. However, if you have a 3-stage
mast, run the cable along the side of the mast.
Содержание DL-CSW-10AT-LFT
Страница 1: ......