![CAMBRIDGE DL-CSW-10AT-LFT Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/cambridge/dl-csw-10at-lft/dl-csw-10at-lft_installation-setup-and-operation_485866010.webp)
10
Meter Connections
To connect power via fused DC power cable to the CSW-10AT-LFT
Meter. First make sure the On/Off Switch on the rear of the meter
is in the
OFF
position. Connect the ring terminals
directly to the
fork lift battery
.
Next, connect the other
end of the cable to the
rear of the meter for
power.
Power
PIN #
DESCRIPTION
A -------- +12VDC
B -------- GND
Communications port
Signal connection
PIN #
DESCRIPTION
PIN #
DESCRIPTION
3 ----------- TXD
1 ----------- +EXC
4 ----------- +5v
2 ----------- -SIG
5 ----------- SGND
5 ----------- SHIELD
LOAD CELL
6 ----------- -EXC
7 ----------- +SIG
Содержание DL-CSW-10AT-LFT
Страница 1: ......