
Finish T-rail Installation
NOTE:
if you installed the complete bottom rail section this section does not apply
Procedure:
•
Check the elevation drawing to see if the short T-rail is at the top or the bottom
•
Lower the first T-rail down between the rollers and the rail bracket from the top of the sling
•
Loosely attach the 1st T-rail at the base plate and the 1
st
rail bracket then level and plumb
before tightening the rail clips If it’s the short T-rail, ensure the cut end is down and the
tongue or groove is facing up. If it’s a full-length T-rail, ensure the tongue or groove is
facing the proper direction by checking the short T-rail’s uncut end that will be installed at
the top
•
Ensure the T-rail is plumb before tightening the rail clips
•
Loosely attach splice plate to top of 1
st
T-rail
•
Add 2
nd
T-rail to the top of the first. Secure 2
nd
T-rail to splice plate and next rail bracket(s)
Note:
Check that it is plumb before tightening all bolts
•
Repeat step 6 with each new T-rail to the top of the hoistway
•
The T-rails should be straight, plumb, and free from burs on the inward facing side
Содержание JOURNEY LA
Страница 1: ...INSTALLATION MANUAL JOURNEY LU LA ...
Страница 25: ......
Страница 27: ......
Страница 37: ...Adjusting the door with door tool Shim if required Installing the gibs ...
Страница 39: ...Hand Rail Mounting ...
Страница 40: ...Overview of Hoistway Part Location ...