Chapter 4: Cable Installation and Grounding
Cable Grounding
phn-3972 004v000
Page 4-5
5 Install the grounding lug on the grounding bar, or directly to the tower.
6 Tighten the grounding lug
Grounding the PTP 820S Unit
Required Tools
•
Metric offset wrench key wrench #3
•
Metric wrench 10mm
Procedure
1 On the front of each PTP 820S unit, loosen the nut, plain washer and serrated washer from
the GND stud, using the metric offset hexagon key and the wrench.
Содержание PTP 820S
Страница 1: ...INSTALLATION GUIDE PTP 820S and PTP 820S Assured System Release 10 0...
Страница 51: ...Chapter 4 Cable Installation and Grounding Special Instructions for use of Glands phn 3972 004v000 Page 4 19...
Страница 55: ...Chapter 4 Cable Installation and Grounding Connecting an Optical Fiber Cable and SFP phn 3972 004v000 Page 4 23...