10-30
phn-4750_003v006
SITE ACCEPTANCE CHECKLIST
Traffic cables and connections are properly terminated as per
manufacturer/cable instructions
OK
All cabling is secured, tidy, and visibly labeled
OK
8. DC POWER SUPPLY - Two Inputs
Measured DC voltage input to the IDU:
(-40.5 to -60 VDC)
Power-Supply maximum current:
(at least 3 Ampere
per carrier)
Power-Supply is properly grounded
OK
DC power backup type:
IDU DC connector is secure and the DC input leads are correctly
terminated (no bare wires are visible)
OK
IDU DC connector (+) and (GND) leads are shorted and GND is grounded
OK
9. RACK INSTALLATION
Rack is mounted to the shelter floor with four screws
OK
Rack is mounted to the shelter wall with two screws
OK
10. REMARKS/NOTES
11. GENERAL INFORMATION
Site accepted by:
Name:
Title:
Company:
Signature:
Date:
Site approved by:
Name:
Title:
Company:
Signature: