Chapter 10: Acceptance and Commissioning Procedures
Site Acceptance Procedure
Page 10-3
SITE ACCEPTANCE CHECKLIST
(continued)
7. FLEXIBLE WAVEGUIDE
Overall flexible WG length:
Flexible WG type:
Flexible WG is connected securely to ODU and Antenna
OK
Flexible WG connector is weather-proofed (sealed) at the
ODU
OK
At the ODU, the flexible WG has a service/drip loop to
prevent moisture from entering the connector
OK
Flexible WG is secured using suitable restraints to fixed
points at regular intervals (0.5 m recommended)
OK
Flexible WG has no sharp bends, kinks, or crushed areas.
All bends are per manufacturer specifications
OK
Flexible WG point-of-entry to building/shelter is weather-
proof
OK
Flexible WG ends are properly labeled
OK
8. DC POWER SUPPLY - Two Inputs
Measured DC voltage input to the IDU:
(-40.5 to -60 VDC)
Power-Supply maximum current:
Power-Supply is properly grounded
OK
DC power backup type:
IDU DC connector is secure and the DC input leads are
correctly terminated (no bare wires are visible)
OK
IDU DC connector (+) and (GND) leads are shorted and
GND is grounded
OK
9. RACK INSTALLATION
Rack is mounted to the shelter floor with four screws
OK
Rack is mounted to the shelter wall with two screws
OK