Chapter 5: Installation
220
PMP 4 50 SM ( except PMP 4 50 SM - 90 0 MHz)
1
Use stainless steel hose clamps for the attachment.
2
Attach the mounting bracket to the structure. Tighten
the locking nut.
PMP 4 50 SM 90 0 MHz ( connect orized)
The PMP 450 900 MHz connectorized SM mounting procedure is different from other radios. It does not
get directly mounted on pole.
1
Align the 900 MHz SM to E bracket of Yagi antenna
2
Slide the radio towards right to lock on the antenna
Mount t he t op LPU
1
For separate LPU mounting, use the U-bolt bracket from the LPU
kit to mount the top LPU on the pole below the ODU. Tighten to a
torque setting of 7.0 Nm (5.2 lb ft).
Please refer Gigabit LPU and Grounding Kit Installation Guide for
more details.
Содержание PMP 450 AP
Страница 92: ...Chapter 2 System hardware 92 Figure 29 MicroPoP Omni antenna implementation pattern Vertical ...
Страница 134: ...Chapter 3 System planning 134 Figure 51 Mast or tower installation ...
Страница 135: ...Chapter 3 System planning 135 Figure 52 Wall installation ...
Страница 136: ...Chapter 3 System planning 136 Figure 53 Roof installation ...
Страница 137: ...Chapter 3 System planning 137 Figure 54 GPS receiver wall installation ...
Страница 158: ...Chapter 3 System planning 158 Figure 61 cnMedusa Antenna ...
Страница 258: ...Chapter 5 Installation 258 Figure 123 Yagi antenna alignment horizontally Figure 124 Yagi antenna alignment upward tilt ...