
Handi-Lift ML7
© 2021
Page 11
Version 1.2
N is connected to terminal 4
Earth is connected to the earth terminal
4.5
Load cell adjustment
Test the lift with max. load (Ex. 300 kg.) + 50kg. The load cell is adjusted from the
factory, however if it is necessary to adjust it, it is done by turning the load cell
sensor. This is installed at the upper cross bar on the platform, right next to where
the wiring from the platform comes up.
Fig. 13
The potentionmeter on the main PCB (R63) may not be used.